Site conditions in Artibonite
What the site asks of your steel
- Flood
- River and flash floods
- Seismic
- Moderate to high
- Wind
- Hurricane exposure
- Ground
- River soils
Our design note. The Artibonite needs rice stores, mills, warehouses and markets that stay above the flood. Raised floors, seismic frames and wind-rated roofs go together here.
Artibonite at a glance
The ground, the work and the road in
Ground and climate
River plain and delta of the Artibonite, dry hills around Gonaïves; flood-prone low ground.
What gets built
Rice and other crops, mills and stores, commerce, port activity at Saint-Marc and Gonaïves, schools and services.
Getting steel there
About two to four hours north of Port-au-Prince on National Road 1; Gonaïves also has a port.
Towns: Gonaïves · Saint-Marc · Dessalines · Verrettes · L’Estère
Steel we recommend
What we fabricate for Artibonite
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Agricultural buildings
Rice, coffee and mango stores, packing houses and agro-processing sheds.
Agricultural steel buildings →Warehouses and logistics
Clear-span warehouses for relief stocks, food, imports and distribution.
Warehouse and distribution buildings →Markets and commercial buildings
Covered markets, supermarkets, shops and offices.
Commercial steel buildings →Contractors in Artibonite
You win the job in Artibonite. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Artibonite
Can you supply rice stores and mills?
Yes. Clear-span stores and mill buildings, with floors set above the flood level your engineer sets.
Was Gonaïves badly flooded before?
Yes, notably in 2004 and 2008. Your engineer sets the flood level and we design the frame and floor to it.
Artibonite and Centre
Other departments: artibonite and centre
The rice valley of the Artibonite and the Central Plateau up to the Dominican border.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Haiti
Talk to us about steel for Artibonite
Send the drawings or the site, size and use. We design or detail the steel for Artibonite’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Cap-Haïtien or Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.