Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sud · Department

Steel buildings and structural steel for Sud, Haiti

Sud runs along the southern coast of the peninsula, with Les Cayes as its port and capital and the beaches of Port-Salut to the west. It was hit by Hurricane Matthew in 2016 and the earthquake of 2021.

Southern peninsula · Capital Les Cayes

Capital
Les Cayes
Group
Southern peninsula
Main towns
Les Cayes, Aquin, Port-Salut
Port
Port-au-Prince

Site conditions in Sud

What the site asks of your steel

Seismic
High, Enriquillo fault
Wind
Matthew 2016
Flood
Rivers and surge
Air
Salt on the coast

Our design note. Sud is rebuilding from both a hurricane and an earthquake. Schools, clinics and markets need ductile frames, wind-rated roofs and coatings for the coast.

Sud at a glance

The ground, the work and the road in

Ground and climate

Coastal plain around Les Cayes and fertile valleys below the Massif de la Hotte.

What gets built

Agriculture, fishing, commerce and port activity at Les Cayes, schools and health services.

Getting steel there

About four hours west of Port-au-Prince on National Road 2; Les Cayes has a small port.

Towns: Les Cayes · Aquin · Port-Salut · Camp-Perrin · Côteaux

Steel we recommend

What we fabricate for Sud

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools and universities

Classrooms, halls and campus buildings designed for earthquakes and storms.

Sports facilities and arenas →

Hospitals and clinics

Multi-storey and single-storey health buildings with seismic frames.

Multi-storey steel framing →

Markets and commercial buildings

Covered markets, supermarkets, shops and offices.

Commercial steel buildings →

Contractors in Sud

You win the job in Sud. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Sud

Can you supply schools and clinics for Les Cayes?

Yes. Seismic frames packed by building, shipped to Port-au-Prince or another agreed port and trucked west.

Can one design cover the hurricane and the earthquake?

Yes. Your engineer checks both, and the steel frame is designed for the governing loads.

Southern peninsula

Other departments: southern peninsula

Nippes, Sud and Grand’Anse: Les Cayes, Jérémie and the long south-western peninsula.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Haiti. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Haiti

Talk to us about steel for Sud

Send the drawings or the site, size and use. We design or detail the steel for Sud’s earthquake, hurricane and flood conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port-au-Prince. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.