Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Haiti · Coatings

Coatings for steel in Haiti’s coastal towns and tropical rain

Most of Haiti’s cities sit on the coast: Port-au-Prince, Cap-Haïtien, Les Cayes, Jacmel, Gonaïves, Port-de-Paix, Jérémie. Salt air, heat and heavy seasonal rain all attack steel, and maintenance budgets are often tight. Good protection applied in the shop is the cheapest protection over the life of a school or warehouse. We choose preparation, coating system and thickness for each exposure.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port-au-Prince or Cap-Haïtien.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Cities
Mostly coastal
Climate
Hot, humid, seasonal rain
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for Haiti, confirmed with your engineer for each project.

SiteTypical protection
Inland, enclosed buildingZinc-rich primer and finish coat on sheltered steel
Coastal townZinc-rich primer, epoxy intermediate, polyurethane finish
Seafront and port buildingsMarine-grade high-build system or duplex
Open sheds and canopiesHot-dip galvanizing for low maintenance
Bridges and exposed steelGalvanized or duplex systems

In our plant

How coating quality is built in

Blast cleaning

Members for Haiti are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Haiti.

Measured film

Dry film thickness measured and recorded for every member shipped to Haiti.

Brands sold in the region

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in Haiti can buy them for touch-up.

Haiti

After erection

Every bundle shipped to Port-au-Prince carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

Department by department

How this applies in your department

Haiti has 10 departments. Open Nord-Ouest, Ouest or Nord to see the local wind, ground and coast, the road from Port-au-Prince and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Haiti project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Haitian buyers ask

Is galvanizing worth it for schools and sheds?

Often yes. Galvanized steel needs little maintenance for many years, which suits buildings with tight upkeep budgets.

Does inland steel need the same coating as coastal steel?

No. Enclosed inland steel needs less protection. Your engineer and the owner set the system for each site.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to Port-au-Prince names the products.

Contact World Steel · Haiti

Talk to us about steel for Haiti

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.