Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Haiti · Public works

Steel for Haiti schools, hospitals, markets and factories

Thousands of schools, clinics and public buildings were lost in the 2010 and 2021 earthquakes. Their replacements, many funded by development partners, have to be safe in the next one. Light steel frames detailed for ductility, made in a plant with full inspection records, meet that need. The same frames suit warehouses, covered markets and factories in the industrial parks.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port-au-Prince or Cap-Haïtien.

Red multi-story process tower frame next to a feed mill
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Schools
Light, ductile frames
Records
Mill, weld and coating
Inspection
Remote or in person
Capacity
2,500 t a month

Project types

What we fabricate for Haiti

Schools

Classroom blocks and halls, designed as shelters where required.

Hospitals and clinics

Seismic frames for health buildings that must stay in use.

Covered markets

Long-span roofs over market halls.

Warehouses

Food, relief and import stores near the ports.

Factories

Apparel and assembly plants in the industrial parks.

Footbridges

Truss bridges over ravines and rivers.

Records

Everything an inspector asks for

Funded projects are audited. We keep mill certificates traced by heat, weld records, coating thickness readings and QC release for every member, and give inspectors remote or in-person access to our plant.

Large programs are released by building or by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Who does what

Project work, split clearly

World Steel supplies

  • Steel design or detailing to the Haiti National Building Code
  • Fabrication, coating and QC release
  • Inspection records for every member
  • Packing by building and shipping to Haiti
  • Shop and erection drawings, included

The contractor arranges

  • Owner or funder contract and permits
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and site safety
  • Finishes, services and fit-out

Products and solutions

The World Steel pages behind this guide

Department by department

How this applies in your department

Haiti has 10 departments. Open Centre, Sud-Est or Nippes to see the local wind, ground and coast, the road from Port-au-Prince and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Haiti project is cut, welded, inspected and packed.

Multi-story steel frame rising next to a fabrication hall
Going up beside the plant in Vietnam: World Steel framed its own office building.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.

Q&A

What Haitian buyers ask

Can you supply a program of many schools?

Yes. Repeated school designs suit steel well: we fabricate them as a series, packed by school, and release them as sites are ready.

Can a funder’s inspector check the steel in your plant?

Yes. Remote or in-person inspector access is available on request, with records for every member.

Do you work with local contractors?

Yes. Contractors in Haiti are our customers: they win the work and erect it, and we design, fabricate and supply the steel.

Contact World Steel · Haiti

Talk to us about steel for Haiti

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.