Who decides what
Three parties, one specification
Why it pays
Rework found on paper, not on site
Fewer gaps
Ratings, members and coatings aligned.
Less rework
Problems found before fabrication.
Clear data
What the design team needs.
Clear roles
Who decides what.
Specification
Specification support at a glance
- Ratings
- Per IBC Chapter 7, set by your design team
- Assemblies
- ASTM E119 or UL 263 listed assemblies
- Our input
- Member sizes, section data and primer systems
- Coordination
- Primer and protection matched before fabrication
- Responsibility
- Code analysis stays with the architect and fire protection engineer
- Output
- Steel data the design team needs
Photo
PhotoHow it works
Before fabrication
- Ratings receivedFrom the design team.
- Steel data preparedSizes and section data.
- Primer matchedTo the protection system.
- Specification alignedBefore fabrication.
Questions
Specification questions
Do you set the fire ratings?
No. The architect and fire protection engineer remain responsible for the code analysis and ratings. We supply the steel data they need.
Are your coatings UL certified?
The coating products we use carry UL certification, and our painters are trained and certified by the paint manufacturer. The listed assembly and the rating still come from your design team and the fire protection manufacturer; we make sure our steel and primers fit the assembly your team chose.
When should this start?
Before fabrication, ideally while the steel design is being finalized.
More optional add-ons: Cementitious Fireproofing · Coating Compatibility Review · Fire Protection Inspection Documentation · Cable Tray Supports
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Fire Protection Specification Support
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions