Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Optional add-ons · Cementitious fireproofing

Steel that is ready for the fireproofing crew

Spray-applied fire-resistive material is the usual choice where structural steel will hide above ceilings or inside walls. It is sprayed on site, after erection and decking, by your fireproofing applicator, not in our plant. What we control is the steel underneath: bare where the listed design allows, or primed with a primer the SFRM manufacturer accepts, with slip-critical faces masked as specified. Get that wrong and the material will not bond.

Steel beam section: the left half shows the shop primer, the right half shows the sprayed fire-resistive layer added on site Shop bare or primed Site SFRM sprayed
IllustrationSFRM is sprayed on site, never in our plant.

Who does what

Our side of the line, and yours

In our plantSteel left bare or primed with an accepted primer. Slip-critical faces masked. Records kept.
On your siteYour applicator sprays the SFRM after erection and decking. Your special inspector checks thickness, density and bond.

Why it pays

Fireproofing that bonds the first time

  • Bond from day one

    Surface matched to the material.

  • No re-priming on site

    Primer agreed before fabrication.

  • Records ready

    Primer and DFT records.

  • Clear split of work

    Shop and site roles defined.

Specification

SFRM-ready steel at a glance

Our scope
Structural steel prepared for SFRM
Surface
Bare where the listed design allows, or primed with a primer the SFRM manufacturer accepts
Masking
Slip-critical surfaces masked as specified
Ratings
Required ratings from IBC Chapter 7, set by your design team
Thickness
From the ASTM E119 or UL 263 listed design chosen by the design team
On site
Applied by your applicator; checked by your special inspector
Primed column with its bolted end plate set on painting standsPhoto
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Coated members drying in rows on stands in the paint hallPhoto
Members drying in the World Steel paint hall in Vietnam after coating.
  1. Listed design chosenBy your design team.
  2. Primer agreedWith the SFRM manufacturer.
  3. Steel preparedBare or primed, masked.
  4. Shipped with recordsFor the inspector.

Questions

Cementitious fireproofing questions

Do you spray the fireproofing?

No. SFRM is sprayed on site after erection and decking by your fireproofing applicator. We supply the steel prepared for it.

Bare or primed?

Many listed designs allow bare steel, which bonds best. Where steel must be primed, we use a primer the SFRM manufacturer accepts.

Who decides the thickness?

The design team, from the ASTM E119 or UL 263 listed design. Your special inspector checks thickness, density and bond on site.

Who primes the steel when a primer is needed?

Our own painters, in our paint shop. They are trained and certified by the paint manufacturer, and the coating products we use carry UL certification. The SFRM itself is still sprayed on site by your applicator.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Cementitious Fireproofing

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of optional add-ons (made in vietnam), standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.