Four jobs
Where C sections work in your building
- PurlinSimple spans between roof frames.
- GirtAcross the columns to carry wall panels.
- JambVertical framing beside doors and windows.
- HeaderOver openings to carry the wall above.
Why it works
Simple shape, clean details
Versatile
One section framing roofs, walls and openings.
Clean openings
Flat backs give square, neat door and window frames.
Easy to connect
Bolts to clips and to other members without fuss.
Cut and labeled
Every piece marked to the erection drawings.
How it is made
Formed, punched, cut
- Openings and spansTaken from the approved drawings.
- Roll-formedFormed, punched and cut in our plant.
- Bundled by areaRoof, walls and openings packed apart.
Specification
C sections at a glance
| Section | Cold-formed C (lipped channel); depth and thickness in mm with inches and gauge in parentheses |
|---|---|
| Steel | Zinc-coated or primed cold-formed steel from mills in Vietnam |
| Uses | Purlins, girts, door and window jambs, headers and sills |
| Punching | Holes for bolts, sag rods and clips punched to the shop drawings |
| Design basis | Designed to AISI S100 with ASCE 7-22 loads |
| Pairs | Back-to-back pairs for heavier jambs and headers |
Photo
PhotoWhere it goes
Buildings full of openings
Questions
C purlin questions
What is the difference between C and Z purlins?
Both are cold-formed. Z purlins nest at the frames and can be lapped into continuous beams; C sections cannot nest, so they work as simple spans and are the usual choice for jambs and headers.
Can C sections frame my doors and windows?
Yes. Jambs, headers and sills around openings are usually C sections, single or back to back, sized for the door and wind loads.
What thickness do you supply?
Thickness and depth come from the design and appear in your quote in mm, with inches and gauge in parentheses.
More secondary framing: Z Purlins · Wall Girts · Eave Struts · Sag Rods · Roof Bracing · Wall Bracing · Secondary Connection Components · Framing Accessories
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for C Purlins
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides