Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural bolts · Galvanized and weathering

Bolts that age with the steel they hold

A galvanized frame needs galvanized bolts, and bare weathering steel needs Type 3 bolts that weather the same way, or the joints rust first. Each coating has rules: which grades can be galvanized, how nuts are overtapped, which zinc-flake coatings A490 may take. On packages from our plant, which fabricates 2,500 metric tons of structural steel a month, coated assemblies are matched to the finish of the frame, bagged apart from plain bolts and confirmed with their coating reports in each quote.

Left: zincRight: weathering patina

2,500 t a month

Galvanized and weathering frames get bolts matched to their finish in the same release.

Matched to the frame

The bolt list follows the coating of the steel, joint by joint, inside and out.

Coated sets kept apart

Galvanized, zinc-flake, Type 3 and plain assemblies never share a bag.

Coating reports

Coating thickness and assembly test reports come with the bolt certificates.

Coatings by grade

Which bolt can take which finish

FinishStandardA325 and F1852A490 and F2280A307
Hot-dip galvanizingASTM F2329AllowedNot allowedAllowed
Mechanical zincASTM B695 Class 55AllowedNot allowedAllowed
Zinc-flake coatingASTM F1136 Grade 3AllowedAllowedBy agreement
Zinc-aluminum coatingASTM F2833 Grade 1AllowedAllowedBy agreement
Type 3 weathering steelASTM F3125 Type 3AllowedAllowedNo weathering type

Summarized from ASTM F3125 and A307. The project specification names the coating; the Engineer of Record approves any change.

Galvanized sets

Four rules for hot-dip galvanized assemblies

One supplier, one set

Galvanized bolts, nuts and washers come from one supplier and are tested together as an assembly.

Overtapped, lubricated DH nuts

Nuts are tapped oversize after galvanizing and lubricated, so the set reaches pretension without galling.

No reuse after pretension

The RCSC Specification does not allow galvanized A325 bolts to be reused once pretensioned.

Galvanizer named in the quote

Frames and bolts are galvanized to ASTM A123 and F2329 through an outside galvanizer named in the quote.

Galvanized frames: hot-dip galvanizing and the ASTM A123 guide. Nuts for coated bolts: heavy hex nuts.

Weathering sets

A Type 3 assembly for bare weathering steel

Type 3 bolts

A325 or A490 Type 3, with copper, nickel and chromium; the grade mark is underlined.

C3 or DH3 nuts

Weathering grade nuts from ASTM A563, so the nut weathers like the bolt.

F436 Type 3 washers

Weathering washers where the joint needs a washer.

Bare weathering steel

For frames of A588 or A847 weathering steel left unpainted to form a patina.

Slip-critical

Galvanized steel in slip-critical joints

Faying surface classGalvanized faying surfaces in slip-critical joints are roughened to reach the slip class on the drawings, often Class A.
Shown on the drawingsSlip-critical joints and their surface class are marked on the shop drawings and kept free of paint and lubricant.

Slip classes and joint types: RCSC Specification.

Who does what

Coated bolts: our part and the US contractor's part

World Steel

  • Matches each bolt line to the finish of the steel it joins
  • Confirms coating, grade, galvanizer and reports in the quote
  • Bags galvanized, zinc-flake, Type 3 and plain sets apart
  • Prepares galvanized faying surfaces to the slip class on the drawings

The US contractor, our customer

  • Engineer of Record specifies the coating and the slip class
  • Erector keeps coated sets together, dry and never reused
  • Erector touches up damaged zinc to ASTM A780
  • Owner’s inspector checks the joints the project lists

Galvanized steel from our jobs

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Hot-dip galvanized welded steel frames laid on trestles in a fabrication shop
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard

Questions

Coated bolt questions from US contractors

Can all structural bolts be hot-dip galvanized?

No. A325, F1852 and A307 can; A490 and F2280 cannot, because the bath can make such hard steel crack later. A490 may take approved zinc-flake coatings instead.

What is ASTM F2329?

It is the standard for hot-dip galvanizing bolts, nuts and washers: it sets the zinc thickness and how the parts are spun to clear the threads.

Why must galvanized bolts and nuts stay together?

The nut is tapped to fit the zinc on that bolt and lubricated for it. ASTM F3125 tests them as one assembly, so mixing sets can strip threads or stall pretension.

What is a Type 3 weathering bolt?

An F3125 bolt made of weathering steel, with copper, nickel and chromium, so it forms the same protective patina as bare weathering steel. The head mark is underlined.

Can galvanized steel be used in slip-critical joints?

Yes, when the faying surfaces are prepared to the slip class the Engineer of Record specifies, often Class A after roughening.

Do you galvanize the bolts yourselves?

No. Galvanizing is done by an outside galvanizer named in the quote, to ASTM A123 for steel and F2329 for fasteners.

Built for large jobs

Galvanized and weathering bolts for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included