Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural bolts · ASTM F3125 Grade A490

More strength per bolt, and stricter rules

Grade A490 carries about a quarter more load than A325 in the same diameter, so heavy splices, moment connections and big bracing joints need fewer bolts and smaller plates. That strength comes with rules: no hot-dip galvanizing, no reuse after pretensioning, and care with washers on softer steel. On large frames from our plant, which fabricates 2,500 metric tons of structural steel a month, we detail A490 joints where the design calls for them and confirm A490 supply and certificates in each quote.

Strength gauge with a green band between 1,040 and 1,190 MPa, the allowed tensile range of A490 bolts, and the A325 minimum marked lower on the scale 6008001,0001,2001,400 TENSILE STRENGTH · MPa A325 MIN A490 BAND
IllustrationNot to scale. A490 must stay inside its band.
2,500 t a month

Heavy frames with A490 splices are detailed and fabricated in the same plant as the rest of the package.

Fewer bolts per joint

Higher strength per bolt keeps big splice plates and gussets compact.

Supply confirmed per quote

Grade, maker and test reports are confirmed for each job before any A490 is ordered.

IAS AC472 plant

Holes, plates and faying surfaces are made under the same accredited quality system as the frame.

Strength band

A minimum and a maximum, both checked

Minimum tensile1,040 MPa150 ksi
Maximum tensile1,190 MPa173 ksi
Nominal tension, Fnt780 MPa113 ksi
Nominal shear, threads in / out469 / 579 MPa68 / 84 ksi

A490 has a maximum strength as well as a minimum: steel that is too hard becomes brittle. Nominal strengths from AISC 360 Table J3.2 for Group B bolts.

A490 rules

Four rules that set A490 apart

Each one comes from ASTM F3125 or the RCSC Specification, and each changes how the bolts are coated, packed or installed.

No hot-dip galvanizing

Zinc baths and mechanical galvanizing can let hydrogen into steel this hard and cause delayed cracking. F3125 allows only approved zinc-flake or aluminum coatings, such as ASTM F1136 Grade 3 or F2833, where the specification names one.

No reuse after pretensioning

Once an A490 bolt has been pretensioned, the RCSC Specification does not allow it to be loosened and used again.

Hardened washers on softer steel

Where A490 bolts clamp steel with a specified yield below 280 MPa (40 ksi), the RCSC Specification calls for F436 washers under the head and the nut.

Heavy hex nuts DH, DH3 or 2H

Only the higher-strength nut grades match A490: ASTM A563 DH or DH3, or A194 2H.

A325 vs A490

The same heavy hex shape, two different bolts

PropertyGrade A325Grade A490
Minimum tensile strength830 MPa (120 ksi)1,040 MPa (150 ksi)
AISC 360 groupGroup AGroup B
Pretension, 22 mm (7/8 in)173 kN (39 kips)218 kN (49 kips)
Pretension, 25 mm (1 in)227 kN (51 kips)285 kN (64 kips)
Hot-dip galvanizingAllowed (ASTM F2329)Not allowed
Reuse after pretensionOnce, with Engineer of Record approvalNot allowed

Pretension from RCSC Specification Table 8.1. Twist-off A490: Grade F2280, on our tension-control bolt page.

Where it fits

Joints where A490 earns its place

Heavy column and girder splices

Thick flanges and big forces where A325 would need too many rows of bolts.

Moment end plates on tall frames

Large tension on the top bolts of extended end-plate connections.

Crane runways and mill buildings

Repeated loads on slip-critical joints in heavy industrial frames.

Large bracing gussets

High brace forces on long-span and seismic frames.

Who does what

A490 bolts: our part and the US contractor's part

World Steel

  • Details A490 joints where the connection design calls for Group B bolts
  • Confirms A490 supply, maker, coating and certificates in the quote
  • Prepares faying surfaces and holes to the slip class on the drawings
  • Bags A490 assemblies apart from A325, labeled by connection

The US contractor, our customer

  • Engineer of Record selects A490 and the joint type
  • Erector keeps A490 apart from A325 on site and never reuses it
  • Erector pretensions with a method verified on site assemblies
  • Owner’s inspector checks the joints the project lists

Heavy members and connections in our plant

Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffened heavy plate girders resting on shop supports
Mobile crane lifting a member into a multi-story steel frame
Welder looking over the stiffeners and end plate of a heavy column

Questions

A490 bolt questions from US contractors

Why can’t A490 bolts be galvanized?

Hot-dip and mechanical galvanizing can let hydrogen into steel as hard as A490, which can crack the bolt days later under load. F3125 allows only approved zinc-flake or aluminum coatings.

Is A490 always better than A325?

No. A490 is stronger, but A325 is easier to coat, more forgiving and enough for most building joints. The Engineer of Record picks A490 only where the extra strength pays off.

Can I swap A325 bolts for A490?

Not without the Engineer of Record. A490 needs different washers, nuts and handling, and A325 in an A490 joint would be too weak. Each joint stays with the grade on the drawings.

How do you keep A490 and A325 apart?

They are bagged separately, labeled by grade and connection, and the bolt list shows which joints take which grade.

Do you always supply A490 bolts?

A490 supply, maker and test certificates are confirmed in the quote for each job that needs them.

What is the A490 tension-control bolt?

It is Grade F2280: the same 150 ksi strength with a spline end that twists off at pretension. See our tension-control bolt page.

Built for large jobs

A490 bolts for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included