Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural bolts · Tension-control bolts

When the spline snaps, the bolt is tight

A tension-control bolt has a splined end that the installer’s electric shear wrench grips while it turns the nut. When the bolt reaches its pretension, the spline twists off, so one person on one side of the joint can pretension a connection and an inspector can see at a glance which bolts are done. On large frames from our plant, which fabricates 2,500 metric tons of structural steel a month, TC bolts are counted, bagged and kept sealed by joint, with supply and certificates confirmed in each quote.

Section through a tension-control bolt: round head, two steel plates, washer and nut, with the splined end twisting off at its groove inside the wrench sockets ROUND HEADPLIESWASHERNUT OUTER SOCKETINNER SOCKETSPLINE BREAKS HERE
IllustrationNot to scale. Installed by the US contractor’s erector.
2,500 t a month

Thousands of pretensioned joints on a large frame are counted and bagged release by release.

One installer, one side

The wrench reacts on the spline, so no backup wrench is needed on the head side.

Sealed by joint

TC bolts depend on their lubricant, so bags stay sealed until the joint is bolted.

Supply confirmed per quote

Grade, maker and lot test reports are confirmed before ordering.

How it installs

Snug, grip the spline, twist off, look

  1. Fit and snugAll bolts in the joint are installed and brought snug so the plies are in firm contact.
  2. Wrench on the splineThe inner socket grips the spline, the outer socket turns the nut.
  3. Spline twists offAt pretension the spline shears at its groove and drops into the wrench.
  4. Look, don’t torqueThe inspector sees which bolts have lost their splines; no torque check is used to accept them.

F1852 and F2280

Two strengths, one twist-off end

Both are grades of ASTM F3125, the same specification as A325 and A490.

Group A · 830 MPa (120 ksi)

Grade F1852

The twist-off version of A325, for most pretensioned and slip-critical building joints.

Group B · 1,040 MPa (150 ksi)

Grade F2280

The twist-off version of A490, for heavy joints. Like A490, it is never hot-dip galvanized.

Heavy hex versions: A325 and A490. Indicator washers for heavy hex bolts: F959 DTIs.

Site rules

What keeps a TC bolt honest on site

Keep them as shipped

Store in closed containers, dry and out of the weather. Rust or lost lubricant raises the torque and can twist off the spline before the bolt is tight.

Verify each lot on site

Before installation, the RCSC Specification asks the erector to pretension sample assemblies from each lot in a tension calibrator to prove the lot reaches its pretension.

Washer under the nut

A hardened F436 washer goes under the nut, the turned element; the round head bears on the steel.

Snug before twist-off

Twisting off bolts one by one in a joint that is not snug can leave earlier bolts loose. Joints are snugged first, then twisted off in order.

Paraphrased from the RCSC Specification, Sections 7 and 8. The full joint-type and inspection rules are on our RCSC Specification page.

Who does what

TC bolts: our part and the US contractor's part

World Steel

  • Counts TC assemblies for every pretensioned and slip-critical joint in the model
  • Confirms F1852 or F2280 supply, maker and lot test reports in the quote
  • Ships the assemblies sealed and labeled by lot and connection
  • Includes extra assemblies per lot for site verification

The US contractor, our customer

  • Erector stores the bolts sealed and dry
  • Erector verifies each lot in a tension calibrator before use
  • Erector snugs, then twists off, joint by joint
  • Owner’s inspector checks splines and verification records

Pretensioned frames from our plant

Metal floor deck laid on each level of a steel-framed building
Welded members with drilled end plates laid out side by side
Rows of labeled steel bundles ready to leave the plant

Questions

Tension-control bolt questions from US contractors

What is a tension-control bolt?

A structural bolt with a round head and a splined end. A shear wrench turns the nut against the spline until the spline twists off at pretension. ASTM F3125 calls them Grades F1852 and F2280.

Is a sheared spline proof of pretension?

Only when the lot has been verified on site. The RCSC Specification asks for sample assemblies from each lot to be tested in a tension calibrator before installation.

Why does storage matter so much for TC bolts?

They reach pretension through a set torque, so the lubricant matters. Wet, rusty or dry assemblies can twist off early, before the bolt is tight.

Can TC bolts be used in snug-tight joints?

They can, but they cost more than heavy hex bolts and the spline adds nothing there. Snug-tight joints usually take A325 or A307 heavy hex bolts.

Can tension-control bolts be galvanized?

F1852 can be supplied with approved zinc coatings when the specification asks; F2280, like A490, is never hot-dip galvanized.

Do you supply TC bolts with the steel?

TC bolt supply, grade, maker and lot test reports are confirmed in the quote for each job that calls for them.

Built for large jobs

Tension-control bolts for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included