Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural bolts · Heavy hex nuts

A bolt is only as strong as its nut

Every structural bolt and anchor rod needs a nut of the right grade, or the threads strip before the bolt reaches its strength. ASTM F3125, F1554 and A193 each name the nut grades that match them, from ASTM A563 grade A for an F1554 Grade 36 rod to A563 DH or A194 2H for A490. On packages from our plant, which fabricates 2,500 metric tons of structural steel a month, nuts are matched to each bolt grade on the bolt list and bagged with their bolts, with grades and certificates confirmed in each quote.

Heavy hex nuts arranged in a honeycomb, marked with the grades DH, 2H, DH3, C, D and A DH 2H DH3 C D A DH 2H C3
IllustrationGrade marks simplified. Real marks follow ASTM A563 and A194.
2,500 t a monthNuts are matched and bagged for every bolted joint and anchor rod in a release.
Matched on the bolt listEach line of the bolt list names the bolt grade and the nut grade that goes with it.
Bagged with their boltsBolts, nuts and washers travel together, so no mixed grades meet on site.
Certificates with the boltsNut test reports come with the bolt and washer reports, named in the quote.

Bolt to nut

Which nut goes on which bolt

F3125 Grade A325, plainA563 C, C3, D, DH or DH3; A194 2HHeavy hex. C3 or DH3 with Type 3 weathering bolts.
F3125 Grade A325, galvanizedA563 DH or A194 2H, galvanizedOvertapped and lubricated, supplied with the bolt.
F3125 Grade A490 and F2280A563 DH or DH3; A194 2HPlain or approved zinc-flake coating only.
F3125 Grade F1852A563 C, C3, D, DH or DH3Supplied in the tension-control assembly.
A307 Grade AA563 grade AHex or heavy hex for secondary steel.
F1554 Grade 36 and 55A563 grade A heavy hexDH or 2H nuts may be used where specified.
F1554 Grade 105A563 grade D or DH heavy hexGalvanized rods take DH nuts.
A193 B7 and A449 rodsA194 2H heavy hexOr A563 DH where the rod standard allows.

Summarized from ASTM F3125 Table A, F1554 and A193. The bolt standard named on the drawings has the last word; our bolt lists follow it.

Sizes

Width across flats, the wrench your crew needs

Heavy hex nuts to ASME B18.2.6, measured across flats.

16 mm (5/8 in) bolt27.0 mm1-1/16 in
19 mm (3/4 in) bolt31.8 mm1-1/4 in
22 mm (7/8 in) bolt36.5 mm1-7/16 in
25 mm (1 in) bolt41.3 mm1-5/8 in
29 mm (1-1/8 in) bolt46.0 mm1-13/16 in
32 mm (1-1/4 in) bolt50.8 mm2 in

Galvanized nuts

Four rules for nuts on galvanized bolts

Overtapped

Zinc adds thickness to the bolt thread, so galvanized nuts are tapped oversize after galvanizing to fit.

Lubricated

F3125 asks for a lubricated nut on galvanized A325, so the assembly can reach pretension without galling.

Supplied as an assembly

Galvanized bolt, nut and washer come from one supplier and stay together, tested as a set.

Not mixed with plain nuts

An overtapped nut on a plain bolt has less thread engagement, so plain and galvanized nuts never share a bag.

More on coated assemblies: galvanized and weathering bolts.

Who does what

Nuts: our part and the US contractor's part

World Steel

  • Names the nut grade for every bolt and rod line on the bolt list
  • Confirms nut grades, finishes and test reports in the quote
  • Bags nuts with their bolts and washers by joint
  • Keeps galvanized and plain assemblies in separate bags

The US contractor, our customer

  • Engineer of Record names the bolt and rod standards
  • Erector keeps assemblies together and dry on site
  • Erector checks nut marks against the bolt list
  • Owner’s inspector checks the fasteners the project lists

Stores, base plates and checks in our plant

Plate and coil strip racked by grade and heat number in the store
Tubular column with a square base plate and bolt holes, crew working behind it
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Quality inspector taking dimensions on a finished steel member

Questions

Nut questions from US contractors

Why do structural bolts need heavy hex nuts?

Heavy hex nuts are thicker and wider than ordinary hex nuts, so they carry the full strength of a high-strength bolt and bear over a larger area of steel or washer.

What does DH on a nut mean?

DH is the highest-strength carbon steel grade in ASTM A563, heat treated for bolts like A490 and galvanized A325. The grade mark is stamped on a face of the nut.

Is an A194 2H nut the same as A563 DH?

They are different standards but both are accepted for A325 and A490 bolts by ASTM F3125. A194 2H is also the usual nut for A193 B7 rods.

Why are galvanized nuts overtapped?

Zinc makes the bolt thread fatter, so the nut is tapped oversize after galvanizing to fit. That is why galvanized nuts must not go on plain bolts.

Which nut goes on an F1554 Grade 36 anchor rod?

An ASTM A563 grade A heavy hex nut, unless the drawings call for a stronger grade. Leveling nuts and top nuts are both heavy hex.

Do you supply nuts with the bolts?

Yes. Nuts are matched to each bolt and rod grade on the bolt list and bagged with them; grades and certificates are confirmed in each quote.

Built for large jobs

Heavy hex nuts for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included