Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural bolts · ASTM F3125 Grade A325

The bolt most US steel frames are bolted with

Grade A325 is the workhorse of US structural steel: a heavy hex bolt of 830 MPa (120 ksi) minimum tensile strength that carries beam, brace and column connections in buildings of every size. World Steel counts every A325 assembly from the connection design, bags it with its nuts and washers by joint and ships it with the steel, from a plant that fabricates 2,500 metric tons of structural steel a month. Supply, maker and certificates are confirmed in each quote.

A bolt test report sheet with rows for grade, tensile strength and lot, and a heavy hex bolt head marked A325 drawn as a stamp BOLT TEST REPORT · ASTM F3125 GRADEA325 TYPE 1 TENSILE MIN830 MPa (120 ksi) SIZE22 mm (7/8 in) NUTA563 DH WASHERF436 TYPE 1 LOTper shipment A325 MAKER
IllustrationSample layout. Real test reports come from the bolt maker named in the quote.
2,500 t a month

A325 assemblies are counted for every bolted joint the plant fabricates, release by release.

Counted, not weighed

Each bolt list comes from the connection model, joint by joint, with spares for site losses.

Bagged by joint

Bags are labeled with the drawing, the connection mark and the bolt size.

Certificates per lot

Manufacturer test reports for bolts, nuts and washers, named in the quote.

Properties

A325 at a glance, metric first

PropertyMetricInch
Minimum tensile strength830 MPa120 ksi
Diameters12.7 to 38.1 mm1/2 to 1-1/2 in
Common building sizes19, 22 and 25 mm3/4, 7/8 and 1 in
AISC 360 groupGroup AGroup A
Nominal tension, Fnt620 MPa90 ksi
Nominal shear, threads in / out370 / 469 MPa54 / 68 ksi

Nominal strengths from AISC 360 Table J3.2 for Group A bolts. The connection design applies the resistance or safety factors; your Engineer of Record confirms the bolt grade on the drawings.

Read the head

Every F3125 bolt carries its grade and the maker’s mark on the head. "A325" means 120 ksi; an underlined mark means Type 3 weathering steel. A head with no grade mark is not a structural bolt.

Need the higher strength? See A490 bolts. Twist-off version: tension-control bolts.

Pretension

Minimum pretension for A325, size by size

12.7 mm1/2 in53 kN12 kips
15.9 mm5/8 in85 kN19 kips
19.1 mm3/4 in125 kN28 kips
22.2 mm7/8 in173 kN39 kips
25.4 mm1 in227 kN51 kips
28.6 mm1-1/8 in285 kN64 kips
31.8 mm1-1/4 in360 kN81 kips
38.1 mm1-1/2 in525 kN118 kips

Minimum pretension for Group A bolts in pretensioned and slip-critical joints, from RCSC Specification Table 8.1 (70% of minimum tensile strength). Snug-tight joints need no set pretension. Joint types are explained on our RCSC Specification page.

Type 1 and Type 3

Two chemistries, one strength

Type 1

Medium carbon, carbon boron or alloy steel. The everyday A325 for painted, galvanized or bare steel kept dry indoors.

Type 3

Weathering steel with copper, nickel and chromium, for bare weathering steel left to form its own patina. The grade mark on the head is underlined.

The assembly

What goes in every A325 bag

Heavy hex bolt

Head marked A325 with the maker’s mark; threaded length set by the grip of each joint.

Heavy hex nut

ASTM A563 grade C, C3, D, DH or DH3, or A194 2H, as F3125 allows for A325; DH or 2H when galvanized.

Hardened washer

ASTM F436, where the RCSC Specification calls for one: oversized or slotted holes, turned element, or as drawn.

Direct tension indicator

ASTM F959, when your contractor’s installation method uses them, supplied with the assemblies on request.

PlainBlack oxide or plain finish for interior steel that is painted or kept dry.
Hot-dip galvanizedZinc to ASTM F2329, with overtapped and lubricated DH nuts, shipped as matched assemblies for galvanized frames.
Zinc flake or mechanical zincASTM F1136 or B695 coatings where the specification names them.
WeatheringType 3 bolts with C3 or DH3 nuts and Type 3 washers for bare weathering steel.

Who does what

A325 bolts: our part and the US contractor's part

World Steel counts, confirms, bags and ships. The US contractor, our customer, installs and inspects.

World Steel

  • Counts every A325 assembly from the connection model, with grip lengths and spares
  • Confirms grade, finish, maker and certificates for bolts, nuts and washers in the quote
  • Bags and tags assemblies by drawing and connection mark
  • Ships the bolts in the same containers as the steel they connect

The US contractor, our customer

  • Engineer of Record sets the bolt grade and joint type on the drawings
  • Erector stores bolts dry and runs pre-installation verification
  • Erector installs, snugs and pretensions to the RCSC Specification
  • Owner’s inspector checks bolting as the project requires

Bolted connections in our work

Welded members with drilled end plates laid out side by side
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Fitter comparing a built-up beam with its shop drawing
Painted members strapped into bundles and stacked for the voyage

Questions

A325 bolt questions from US contractors

What is the difference between A325 and F3125?

ASTM F3125 is the umbrella specification that replaced the separate A325, A490, F1852 and F2280 standards in 2015. A325 is now one grade inside it, with the same 120 ksi strength.

Is A325 strength lower above 1 inch?

Not any more. The old A325 dropped to 105 ksi above 1 in; under F3125, Grade A325 is 830 MPa (120 ksi) minimum for every diameter from 1/2 to 1-1/2 in.

Can A325 bolts be hot-dip galvanized?

Yes. Grade A325 can be galvanized to ASTM F2329. The nuts are overtapped and lubricated, and the bolt, nut and washer are supplied together as one assembly.

Can A325 bolts be reused?

Plain A325 bolts may be retightened once when the Engineer of Record approves, as the RCSC Specification allows. Galvanized A325 bolts that were pretensioned should not be reused.

Which joints need A325 bolts pretensioned?

The connection design says. Most shear joints are snug-tight; pretensioned and slip-critical joints are marked on the drawings and installed to RCSC rules.

Do you confirm A325 supply for every job?

Yes. The grade, finish, maker and test certificates for bolts, nuts and washers are confirmed in each quote, never assumed.

Built for large jobs

A325 bolts for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included