Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural bolts · Metric and foreign equivalents

Comparable on paper, not interchangeable on site

Steel fabricated outside the US meets bolt standards from other systems: ISO 898-1 property classes 8.8 and 10.9, the European EN 14399 HR and HV sets, Japan’s JIS B1186 F10T and Vietnam’s TCVN 1916. Their strengths come close to A325 and A490, but threads, hole sizes, heads, yield ratios and pretension rules differ. On US jobs from our plant, which fabricates 2,500 metric tons of structural steel a month, the bolts on the drawings are the ASTM grades the Engineer of Record specified; this table helps you read foreign references, and any substitution needs the Engineer of Record’s written approval.

Three columns of bolt standards, ASTM, ISO and EN, and JIS and TCVN, with dotted lines linking comparable grades and a red bar reading not interchangeable without the Engineer of Record ASTM A325A490A307 ISO / EN 8.810.94.6 JIS / TCVN F8TF10T4.6 COMPARABLE · NOT INTERCHANGEABLE WITHOUT THE EOR
IllustrationSimplified. Full table below.
2,500 t a month

US packages are detailed to the ASTM bolt grades on the drawings, whatever the plant’s location.

One unit system per job

Holes, bolts and drawings stay in the units of the design: inch for inch-designed jobs, metric only when specified.

Substitutions in writing

No bolt grade changes without the Engineer of Record’s written approval.

Certificates to the named standard

Bolt test reports name the standard the bolt was made to, so nothing is assumed.

Comparable grades

US bolt grades and their nearest foreign counterparts

Read across a row to find the grade a foreign drawing or certificate is closest to, and the column on the right for what still differs.

US gradeUS strengthISO 898-1 / EN 14399JIS / TCVNWatch for
ASTM F3125 A325, F1852 (Group A)830 MPa (120 ksi) minISO 898-1 class 8.8; EN 14399-3 HR 8.8, EN 14399-4 HV 8.8JIS B1186 F8T; TCVN 1916 class 8.8Yield of 8.8 is 640 to 660 MPa; inch versus metric threads.
ASTM F3125 A490, F2280 (Group B)1,040 to 1,190 MPa (150 to 173 ksi)ISO 898-1 class 10.9; EN 14399-3 HR 10.9, EN 14399-4 HV 10.9; EN 14399-10 HRC (twist-off)JIS B1186 F10T; JSS II 09 S10T (twist-off); TCVN 1916 class 10.9Upper strength limits differ; HV sets rely on the nut, not bolt ductility.
ASTM A307 Grade A415 MPa (60 ksi) minISO 898-1 class 4.6TCVN 1916 class 4.6Secondary, snug-tight use only in both systems.
ASTM A563 DH, A194 2H nutsProof load for Group B boltsISO 898-2 class 10; EN 14399 nut class 10JIS B1186 F10 nutsNut height and thread differ; nuts never cross systems.
ASTM F436 washersThrough-hardenedEN 14399-5 and -6 washersJIS B1186 F35 washersOutside and inside diameters fit their own bolts only.
ASTM F959 DTIsSized for Group A or BEN 14399-9 direct tension indicatorsNo common JIS equivalentGap gauges and acceptance rules differ.
ASTM F1554 Grade 36 rods250 MPa (36 ksi) yieldISO 898-1 class 4.6; S235 or S275 rodJIS B1220 ABR400Rods are sized by yield; compare yield, not tensile.
ASTM F1554 Grade 55 rods380 MPa (55 ksi) yieldS355 rod; between ISO 5.6 and 6.8JIS B1220 ABR490No class lines up exactly; weldability (S1) matters.
ASTM F1554 Gr 105, A193 B7 rods725 MPa (105 ksi) yieldISO 898-1 class 8.8 (lower yield); EN 10269 42CrMo4TCVN 1916 class 8.88.8 yield is lower than 105 ksi; quenched and tempered, not welded.

Nominal figures for reading foreign references only. Each standard has its own size range, tests and marking; check the current edition named in the project specification. US grades in depth: A325, A490, A307, F1554 anchor rods, A193 B7 and A449 rods.

What differs

Six things that differ even when the strength is close

Threads

US bolts use inch UNC threads; ISO, EN, JIS and TCVN bolts use metric threads. A metric nut does not fit an inch bolt.

Hole sizes

AISC standard holes are the bolt diameter plus 1.6 mm (1/16 in); metric practice uses plus 2 or 3 mm. Holes are drilled for one system.

Head and nut sizes

Heavy hex US heads, EN HV heads and JIS heads have different widths across flats, so washers and wrenches change.

Yield ratio and ductility

Close tensile strength does not mean the same yield or stretch; HV sets are designed to fail by nut stripping, US and HR sets by bolt stretch.

Pretension rules

RCSC Table 8.1 sets US minimum pretensions; EN 1993-1-8 and EN 1090-2, or JIS practice, use their own values and methods.

Inspection and records

US special inspection checks against RCSC and the bolt lot certificates; a foreign-standard bolt has no RCSC verification basis on its own.

Substitution rule

Comparable grades are not interchangeable without the Engineer of Record

The drawings decide

The bolt grade on the approved drawings is the bolt that ships.

The Engineer of Record approves

Any alternate grade or system is submitted to the Engineer of Record and used only with written approval.

Whole assemblies only

If an alternate is approved, bolt, nut and washer all come from that one system, never mixed.

Drawings revised first

Holes, bolt lists and shop drawings are revised to the approved system before fabrication.

Who does what

Bolt standards: our part and the US contractor's part

World Steel

  • Details US jobs to the ASTM bolt grades on the drawings
  • Flags any foreign-standard reference in a specification as a question to the Engineer of Record
  • Revises holes and bolt lists if an alternate is approved in writing
  • Ships test reports that name the standard each bolt was made to

The US contractor, our customer

  • Engineer of Record specifies bolt grades and approves any alternate
  • US contractor submits substitution requests through the project channel
  • Erector installs only the assemblies on the bolt list
  • Owner’s inspector verifies bolts against the approved standard

Inspection and checks in our plant

Inspector walking a line of painted built-up members on the shop floor
Quality inspector taking dimensions on a finished steel member
Shop worker taking a measurement on a steel plate in the yard
Fitter comparing a built-up beam with its shop drawing

Questions

Bolt equivalence questions from US contractors

Is ISO 8.8 the same as A325?

No. They are comparable: both are about 800 to 830 MPa in tensile strength. But 8.8 is metric-threaded, has a different yield and head size and follows other pretension and inspection rules. It is not interchangeable without the Engineer of Record.

What is the metric equivalent of A490?

ISO 898-1 class 10.9, EN 14399 HR or HV 10.9 and JIS B1186 F10T come closest. They are comparable in strength, not interchangeable without the Engineer of Record’s written approval.

What is the difference between EN 14399 HR and HV?

HR sets have a longer thread and are designed so the bolt stretches before failure, like US bolts. HV sets have a shorter thread and a thicker head, and are designed to fail by nut stripping.

Can a fabricator in Vietnam use metric bolts on a US job?

Only if the Engineer of Record approves it in writing. On US jobs we detail to the ASTM grades on the drawings.

What does TCVN 1916 cover?

TCVN 1916 is the Vietnamese standard for the technical requirements of bolts, screws, studs and nuts. Its property classes follow the ISO 898-1 numbering, such as 8.8 and 10.9.

Does a metric bolt fit an inch hole?

A nearby metric size may pass through, but the edge distances, bearing and hole clearance were checked for the inch bolt. That is why holes and bolts are kept in one system per job.

Steel plate and section grades across standards: structural steel materials to US specifications.

Built for large jobs

Metric and foreign equivalents for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program Fillet, CJP and PJP welds on built-up members

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included