Purlins, girts and their bolts ride in the same release as the frame they hang on.
A large warehouse roof and its walls need bolts at every lap and clip.
Bags are labeled by roof bay or wall elevation, so crews pick the right bag.
Secondary bolts are listed from the model that places every purlin and girt.
Where it goes
Four kinds of joint A307 bolts hold
Z-section laps over the frame and the clips that hold them, all snug-tight.
Angles from the purlins to the rafter flange that brace it against buckling.
Jambs, headers and sills for framed openings in the walls.
Eave struts, base angles and minor framing the design marks snug-tight.
Where it does not go
Three places an A307 bolt never belongs
A307 is not a high-strength bolt; it is not used in pretensioned or slip-critical joints.
Rafter, column and brace connections of the main frame take F3125 high-strength bolts.
Joints of the seismic force-resisting system follow AISC 341 and take pretensioned high-strength bolts.
Main frame joints: A325 bolts. Seismic frames: seismic steel structures.
Grades
A307 Grade A, B and C
General-purpose bolts for steel construction; head marked 307A. The grade used in buildings.
Heavy hex bolts for cast-iron flanged piping joints. Not a structural steel grade.
Once used for anchor rods; withdrawn and replaced by ASTM F1554 Grade 36.
Grade A properties
- Minimum tensile strength
- 415 MPa 60 ksi
- Nominal tension, Fnt
- 310 MPa 45 ksi
- Nominal shear, Fnv
- 188 MPa 27 ksi
- Common sizes in metal buildings
- 12 and 16 mm 1/2 and 5/8 in
Nominal strengths from AISC 360 Table J3.2. Anchor rods: ASTM F1554.
Who does what
A307 bolts: our part and the US contractor's part
World Steel
- Lists every purlin, girt and brace bolt from the building model
- Bags bolts, nuts and washers by roof bay and wall line
- Ships them with the secondary steel they fasten
- Adds spares for site losses
The US contractor, our customer
- Engineer of Record confirms which joints are snug-tight
- Erector installs the secondary steel and snugs the bolts
- Erector keeps A307 apart from high-strength bolts
- Owner’s inspector checks the joints the project lists
Secondary steel packed in our plant
Questions
A307 bolt questions from US contractors
What is an A307 bolt used for?
Snug-tight joints in secondary steel: purlin and girt laps, clips, flange braces and opening framing. It is not used where a joint must be pretensioned.
Is A307 a structural bolt?
It is a carbon steel bolt used in steel construction, but not a high-strength structural bolt. AISC 360 gives it about half the shear strength of an A325.
How is an A307 bolt marked?
Grade A bolts carry 307A on the head with the maker’s mark. A325 and A490 bolts carry their own grade marks.
What replaced A307 Grade C?
Grade C was used for anchor rods and was withdrawn; ASTM F1554 Grade 36 replaced it. See our anchor rod page.
Can A307 bolts be galvanized?
Yes. A307 bolts for galvanized purlins and girts can be supplied hot-dip galvanized with matching nuts.
Are the purlin bolts included with the building?
Yes. Secondary framing bolts are counted from the model and listed in the proposal with the rest of the package.
Roof and wall panel screws: corrosion-resistant fasteners.
Built for large jobs
A307 bolts for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included