Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Shipping simulator · Vietnam to the US

Watch your steel leave our plant and sail to your US port

Pick a US port and an Incoterm. The simulation follows one container from packing at World Steel’s plant in Vietnam, about 2 hours by road to the export terminal, across the Pacific to your gateway, and shows at every stage who pays and who carries the risk.

≈ 2 hby road from our plant to the export port
16US seaports you can pick
11Incoterms® 2020 rules on the route

Shipment simulatorDemonstration data

Incoterm
Vietnam port
Leg 1 · Plant to port about 2 hours by road
Schematic of southern Vietnam: the road from the World Steel plant at Hai Son Industrial Park to the container terminals at Cat Lai and Cai Mep, about 2 hours by road. Not to scale. Ho Chi Minh City World Steel plant Hai Son IP, Tay Ninh Cai Mep Cat Lai East Sea
Leg 2 · Ocean to Houston 11,500 nmi illustrative lane
Illustrative sea lane from Vietnam to the Port Houston, through the Panama Canal, about 11,500 nautical miles. Panama Canal Vietnam Houston
Now
Delivered to the job siteUnloading at your site
This stage paid by
You
Risk carried by
You
  1. Packed and sealed at our plant

    Hai Son Industrial Park, Tay Ninh Province

    • Export packing at our plant: World Steel
    • Loading onto the truck at the plant: World Steel
  2. About 2 hours by road to the port

    Plant gate to the container terminal

    • Vietnam export clearance: World Steel
    • Trucking to Cat Lai or Cai Mep: World Steel
  3. Loaded on board in Vietnam

    Cai Mep or Cat Lai

    • Terminal handling and loading on board: World Steel
  4. Across the Pacific

    Sea lane set by the booking

    • Ocean freight across the Pacific: You
    • Cargo insurance: You
  5. Discharged and cleared in the US

    Your US gateway port

    • Unloading at the US port terminal: You
    • US customs entry (importer of record): You
    • US duties, including Section 232: You
  6. Delivered to the job site

    Your site, by truck or rail

    • Truck or rail to your site: You
    • Unloading at your site: You
  • World Steel pays the stage
  • You pay the stage
  • Risk passes to you

A demonstration, not your shipment. The road leg takes about 2 hours from our plant to the terminal. The sea lane is illustrative: sailings depend on the carrier, port pair and season and are set at booking, so we publish no ocean transit times, freight or landed costs.

One plan, three legs

From our plant gate to your job site

Every World Steel shipment runs the same three legs. We plan them backward from the date your site needs steel, and your project manager holds the whole chain in one schedule.

Leg 1 · By road
PLANTHai Son IP, Tay Ninh
PORTCai Mep or Cat Lai

About 2 hours by roadFrom our plant gate to the container terminal, depending on the terminal and traffic.

  • Bundles scanned into the container in erection order
  • Verified gross mass declared, ISO 17712 seal photographed on the door
  • Vietnam export clearance filed with the shipment
  • Trucks timed to the booking cut-off at the terminal
Leg 2 · By sea
VIETNAMPort of loading
USAWest, Gulf or East Coast

5,500 to 12,200 nmi on our illustrative lanesSailings depend on the carrier, port pair and season and are confirmed at booking.

  • West Coast and Pacific Northwest: direct across the North Pacific
  • Hawaii: across the central Pacific
  • Gulf and East Coast: mostly through the Panama Canal
  • Bill of lading, packing lists and mill certificates sent to your broker ahead of arrival
Leg 3 · Port to site
US PORTYour gateway
SITETruck or rail

Planned with the US contractorThe US contractor, our customer, receives the steel on site and erects it.

  • Customs entry filed by the broker for the importer of record named in the quote
  • Drayage, flatbed transload or rail to an inland ramp
  • Containers pulled in erection order, matched to crane days
  • Readiness per erection step shown in PEB Studio

Ports of loading

Two Vietnamese gateways, both a short drive from our plant

Your containers leave from Cai Mep–Thi Vai or Cat Lai, whichever the carrier’s service on your booking calls at. Both are reached by road from our plant in about 2 hours, so the steel waits at the plant, not at the terminal.

Deep-water port cluster

Cai Mep–Thi Vai

A cluster of deep-water terminals on the Thi Vai River, southeast of Ho Chi Minh City, where mainline vessels on transpacific services load directly for the US West, Gulf and East Coasts.

  • Mainline vessels
  • Direct US services
  • Thi Vai River

River container terminal

Cat Lai

Vietnam’s busiest container terminal, on the Dong Nai River in Ho Chi Minh City, run by Saigon Newport Corporation. Cargo booked here usually joins a feeder that connects with a mainline service to the US.

  • Ho Chi Minh City
  • Feeder connections
  • Dong Nai River

Named place under FOB, FAS and the other sea terms: FOB Cai Mep or FOB Cat Lai. Want to see the plant before you buy? Tour our plant.

Incoterms® 2020 on the route

Same voyage, different hand-over

Twelve stages from our plant to your site. The color shows who pays each one under the terms we quote most often, and the flag marks where the risk passes to you. Press Simulate to watch it on the route.

FOBFree On Board · Commonly quoted

Our plantAt seaYour site

Risk passes: when the steel is on board the vessel at the named Vietnamese port.

CFRCost and Freight · Commonly quoted

Our plantAt seaYour site

Risk passes: when the steel is on board in Vietnam, even though we pay the freight to the US port.

CIFCost, Insurance and Freight · Commonly quoted

Our plantAt seaYour site

Risk passes: when the steel is on board in Vietnam. From then on, the policy we bought protects you.

DAPDelivered at Place · Commonly quoted

Our plantAt seaYour site

Risk passes: when the truck arrives at the named place, ready for unloading.

DDPDelivered Duty Paid · Case by case

Our plantAt seaYour site

Risk passes: when the truck arrives at the named place, cleared for import and ready for unloading.

  • World Steel pays
  • You pay
  • Carriage contract decides

US gateways

Simulate any of 16 US seaports

Each port has its own guide with terminals, channel depth, rail, highways and the states it serves. The figure beside each port is the length of our illustrative sea lane from Vietnam.

West Coast

Direct across the Pacific

Hawaii

Central Pacific

Gulf Coast

Through the Panama Canal

East Coast

Mostly through the Panama Canal

PEB Studio

The simulation is a demo. Your shipment is tracked for real.

On a World Steel job, every container you just watched appears in your own PEB Studio project, released status by status with its records: what is inside, how it was braced, which seal should be on the door and where it is in the chain. You follow it from your office, in real time, without waiting for an email.

  • Container packing report

    Seal number, verified gross mass, photos and video of each container.

  • English packing lists

    Bundle by bundle, tied to its container and seal.

  • Status by stage

    Packed, sealed, on board, discharged, delivered, each with its own records.

  • Ready for the crane

    Readiness per erection step, so the US contractor books crews against facts.

Worry-free shipping

You order the building. We take care of the shipping.

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Questions from US buyers

Shipping simulator questions

How long does it take to get steel from your plant to the port?

About 2 hours by road from our plant in Tay Ninh Province to the container terminal, depending on the terminal and traffic. Trucks are scheduled so containers reach the terminal inside the booking cut-off.

How long is the ocean leg to my US port?

It depends on the carrier’s service, the port pair, any transshipment and the season, so we do not publish sailing times. The simulator shows the length of an illustrative sea lane in nautical miles for comparison only. The sailing is confirmed at booking and your project manager forwards it.

Is the simulation my actual shipment?

No. It is a demonstration of how a World Steel shipment moves and how the Incoterm in your contract splits the costs and risk along the way. Your real containers appear in your PEB Studio project, each status released with its own photos and records.

Which Vietnamese port will my steel leave from?

Cai Mep–Thi Vai or Cat Lai, depending on the carrier and service on the booking. Cai Mep takes the mainline vessels that sail direct to the US; Cat Lai usually connects through a feeder. Both are reached by road from our plant.

Where does the risk pass to me?

Wherever your Incoterm says. Under FOB, CFR and CIF it passes once the steel is on board in Vietnam, even when World Steel pays the freight. Under DAP or DDP it passes at the named place in the US. Pick a term in the simulator to see the flag move.

Who erects the building when it arrives?

The US contractor, our customer. World Steel designs, fabricates and supplies the steel structure and ships it in erection order; receiving, unloading and erection on site are the contractor’s scope.

Can I choose the US port?

Yes. We plan the gateway with you from where the job is and how the steel moves inland. Each US port has its own page with terminals, rail, highways and the states it serves.

Are US duties included?

Only if the quote says so. Imported steel can be subject to US duties such as Section 232, and we do not publish rates. The quote names the Incoterm, who carries any duties and who acts as importer of record.

Ready to plan the real shipment?

Send the drawings or just a footprint and the site address. We name the port, the Incoterm and the importer of record in the quote, and plan the shipping backward from your site date.