Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Fabrication process · Holes

Holes that line up on site the first time

A field crew loses hours to one wrong hole. World Steel makes bolt holes on laser machines that cut steel up to 100 mm (about 4 in) thick, and on CNC drilling and punching machines, all programmed from the shop drawings, so the anchor bolts, splices and moment connections on your site line up as drawn.

hole spacing from the shop drawing edge distance set in the model laser-cut hole BASE PLATE · up to 100 mm thick

Four ways to make a hole

Laser first, then the machine that suits the part

Our laser machines make holes in steel up to 100 mm (about 4 in) thick in the same program that cuts the plate outline. CNC drilling, punching and magnetic drills cover the rest.

Laser hole-making

Holes and slots in plate up to 100 mm (about 4 in) thick, cut in the same program as the plate outline

CNC drilling

Bolt holes in plates and in members where drilling is the better fit

CNC punching

Repeated hole patterns in thinner plates, clips and secondary parts

Magnetic drilling

Holes on assembled members where a fixed machine cannot reach

Where holes decide the schedule

Four parts your crew bolts first

Base plates

Anchor bolts cast in the foundation do not move. The plate has to match them.

End plates

Moment and shear end plates bolt rafter to column; hole spacing sets the fit of the whole frame.

Splice plates

Splices join long members that were cut to fit a container, so both halves must match.

Clips and brackets

Purlin clips, girt clips and brackets carry the secondary framing at the right line.

Tubular column with a square base plate and bolt holes, crew working behind it Welder guiding a drilled base plate hanging from a jib hoist Welded members with drilled end plates laid out side by side

Checked and signed

Hole checks, laid out like the drawing they come from

CheckHow it is done
Hole diameter and countVerified against the latest shop drawing before the program runs
Hole position and spacingChecked by the fitter and QC at fit-up and recorded on the dimensional inspection report
Edge distanceSet in the model and checked on the part
Burrs and contact facesRemoved so plates seat fully when bolted

Hole positions are measured again on the finished member at straightening and dimensional control, and anchor bolt layouts are covered on our base plates page.

Questions

Bolt hole questions

How are bolt holes made at World Steel?

On laser machines that cut steel up to 100 mm (about 4 in) thick, on CNC drilling and punching machines, and with magnetic drills on assembled members. Each part goes to the method that suits its thickness and hole pattern.

Where do the hole patterns come from?

From the shop drawings detailed in Tekla. Hole sizes, counts and positions are verified against the latest drawing revision before the machine runs.

Will my erector need to ream or burn holes on site?

The aim of the whole process is that they do not. Hole position and spacing are checked at fit-up and recorded on the dimensional inspection report before the member moves on.

Can you match anchor bolts that are already cast?

Yes, when your team sends the as-built anchor bolt survey before the base plates are made, the base plate holes are detailed to it.

Are slotted and oversized holes possible?

Yes, where your Engineer of Record specifies them. They are detailed in the model and cut with the rest of the part.

Built for large jobs

Put your next steel package through this station

Drilling & punching is one of eight stations in a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019 and audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program

Request a quote

Send drawings, a model or a steel list. Our engineers take off the quantities, check the US code basis and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and OEM supply under your brand.

Watch this station work on your own job. Hold and witness points can be attended live on Zoom or Microsoft Teams, and every record is in PEB Studio.

Book an online audit