The line
The last line of heading 7308, and the one most packages lean on
After bridges, towers, doors and windows, scaffolding, columns and beams, and grating have taken their lines, 7308.90.95 is what remains: structures and parts of structures of iron or steel not specified elsewhere. One rate line, three statistical suffixes.
7308.90.95General Free · unit kg · Section 232 Annex I-A · 50%
- 7308.90.95.30Other: Sheet-metal roofing, siding, flooring and roof drainage equipment
- 7308.90.95.60Other: Other: Architectural and ornamental work
- 7308.90.95.90Other: Other: Other
Heading text: "Structures (excluding prefabricated buildings of heading 9406) and parts of structures … of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel". 2026 HTS Revision 23, reviewed November 25, 2026.
Three suffixes
One rate line, three drawers for the statistics
The suffix does not change the duty. It is reported on the entry so US trade figures can tell roofing from ornament from everything else. Items below are the common reading, confirmed by your broker.
Roofing, siding, flooring, drainage
Official words: "Sheet-metal roofing, siding, flooring and roof drainage equipment".
Architectural and ornamental work
Official words: "Architectural and ornamental work".
Other
Official words: "Other".
Prepared or plain
When a steel section stops being a mill product and becomes a part
Heading 7308 takes in shapes, sections and plates “prepared for use in structures”. Each pair below shows the same steel before and after the work that usually moves it out of Chapter 72.
W shapes shipped as rolled, in mill lengths
Plain shapes of Chapter 72, such as heading 7216.
The same shapes cut, coped and drilled to a drawing
Prepared for use in structures: heading 7308.
Flat coated coil or sheet
Flat-rolled products of Chapter 72, such as heading 7210.
Sheet roll-formed into panels cut to building lengths
Sheet-metal roofing or siding: commonly 7308.90.95.30.
Cold-formed C and Z sections in stock lengths
Shapes of Chapter 72 until worked for a structure.
Purlins punched, lapped and cut for one roof
Parts of a structure: commonly 7308.90.95.90.
Flat coated steel from Vietnam is under antidumping and countervailing duty orders since December 2025. Whether formed panels are inside the order scope is checked item by item; see the dated update on the Section 232 page.
What leaves the line
Five things in a steel package that 7308.90.95 does not take
The catch-all only catches what no other line names. These go elsewhere, even when they ride in the same container.
Duty layers
What can sit on a 7308.90.95 entry line
Published US law as of November 25, 2026, for goods of Vietnam. These are the layers an entry can carry, not a duty estimate for your order: the importer of record pays and its broker calculates.
General (column 1) duty
FreeThe rate printed against the HTSUS line, charged as usual on top of Section 232.
Section 232
Annex I-A, 50%Charged on the full customs value since April 6, 2026, at the rate of the annex that lists the line. Vietnam has no lower rate.
Section 301 (Vietnam)
Exempt when 232 appliesThe forced-labor action in force since July 24, 2026 exempts articles subject to Section 232, so a covered line does not stack it.
Antidumping / countervailing
None foundAs of the review date we found no order on fabricated structural steel from Vietnam. Your broker checks each line before entry.
Fees
Charged as usualThe merchandise processing fee and, at seaports, the harbor maintenance fee are charged on the entry.
Sources: 2026 HTS Revision 23 (USITC) for the general rate; the annexes to Proclamation 11021 for the Section 232 listing. Last reviewed . Rules change often; your broker checks them on the day of entry.
Our part
What we put in the file so your broker can classify
World Steel does not choose your HTS number or file your entry. We give the importer of record and its broker the facts, early and in order.
Commercial invoice
Each line described by what it is, how many and its weight in kg. Any HTS number shown is a reference for your broker, not our classification.
Packing list by piece mark
Every bundle and loose piece with its marks, dimensions in mm and weight in kg, so lines can be matched to the invoice.
Mill test certificates
EN 10204 3.1 certificates with mill, heat number and chemistry: the data behind the alloy steel test and the melt-and-pour report.
Drawings and member schedule
Approval and shop drawings that show what each member is and where it goes, for a broker or a ruling request.
Photos of packed bundles
Pictures of the cargo as loaded, which help a broker describe goods that arrive in many containers.
Country and plant of origin
Fabricated in our plant in Vietnam, with the mill country for every heat of steel on the certificates.
The other lines
Four more HTS lines in a steel package
Questions
7308.90.95 questions from US importers
What is HTS 7308.90.95?
It is the US rate line for structures, excluding prefabricated buildings of heading 9406, and parts of structures of iron or steel not specified elsewhere in heading 7308. The general rate is free, the unit is kg, and it is listed in Annex I-A of Proclamation 11021.
What are the statistical suffixes of 7308.90.95?
Three: .30 for sheet-metal roofing, siding, flooring and roof drainage equipment, .60 for architectural and ornamental work, and .90 for other structures and parts. They share one rate line, so the duty is the same; the suffix is reported for statistics.
Are purlins and girts classified under 7308?
When they are cut, punched and made up for a particular structure, they are commonly read as parts of structures under 7308.90.95. Plain cold-formed sections in stock lengths are shapes of Chapter 72. Your broker decides from the facts.
Are metal roof panels 7308.90.95.30 or 7210?
Flat coated sheet and coil are flat-rolled products of heading 7210. Sheet roll-formed into roofing or siding for a structure is commonly read as 7308.90.95.30. Coated flat steel from Vietnam is also under AD/CVD orders, so your broker checks panels against the order scope.
Is a steel truss a structure or a beam?
A truss is usually read as a structure or part of a structure under 7308.90.95, because it is a framed assembly rather than a column or beam. A broker can treat it differently from the facts of a given design.
Does a part of a structure pay the same Section 232 rate as a column?
Yes, for goods of Vietnam as of the review date. Both 7308.90.95 and the column lines are listed in Annex I-A of Proclamation 11021.
Every part listed, every part weighed
Send the job. We detail the frame and its parts, pack them by erection sequence and list them so your broker can file a clean entry.