The lines
Doors, windows, their frames and door thresholds: one subheading, two rate lines
Subheading 7308.30 is written for the openings of a building. It first splits stainless steel from everything else, then splits the "everything else" line three ways for statistics.
| 7308.30.10.00 | Doors, windows and their frames and thresholds for doors: Of stainless steel | General Free | kg |
| 7308.30.50.15 | Doors, windows and their frames and thresholds for doors: Other: Windows and their frames | General Free | kg |
| 7308.30.50.25 | Doors, windows and their frames and thresholds for doors: Other: Thresholds for doors | General Free | kg |
| 7308.30.50.50 | Doors, windows and their frames and thresholds for doors: Other: Other | General Free | kg |
Parts of an opening
Five parts of one doorway, and where each usually goes
An opening in a steel building is a set of things from different trades. Leaf, frame and threshold are named in 7308.30; the jambs and header of the wall belong to the structure; the lock belongs to hardware.
Shown for a single 900 mm (3 ft) personnel door. Your broker classifies each part from how it is shipped.
Personnel doors we supplyDoor schedule
A sample opening schedule, with the line each item usually reads as
Marks and descriptions as they appear on our door lists. The right-hand column is the common reading of the schedule's wording, not a classification of your order.
| Mark | Opening | Steel content | Usually read as |
|---|---|---|---|
| D1 | Personnel door, single leaf | Steel leaf and pressed-steel frame, galvanized and painted | 7308.30.50.50 |
| D2 | Door frame shipped alone | Pressed-steel frame for a door supplied by others | 7308.30.50.50 |
| D3 | Stainless steel door and frame | Leaf and frame of stainless steel, for wash-down areas | 7308.30.10.00 |
| T1 | Door threshold | Steel threshold plate for a personnel or sliding door | 7308.30.50.25 |
| W1 | Steel window with frame | Fixed or sliding window unit with a steel frame | 7308.30.50.15 |
| S1 | Sliding door leaf | Steel-framed leaf clad in panels, with its track supplied apart | 7308.30.50.50 |
Entered apart
Six things around an opening that are not 7308.30
Marked in red, the way a reviewer marks up a drawing: each one sits on a different line, even when it ships in the same crate as the door.
Jambs, headers and girts framing the opening
Part of the building frame, so a part of a structure under 7308.90.
Electric operators and control boxes
Machines and electrical goods with headings of their own.
Locks, hinges, closers shipped loose
Base-metal locks and mountings with headings of their own.
Loose glass for site glazing
Glass is classified as glass when it is not fitted to the window.
Louvers and ventilators
Not doors or windows, so usually a part of the structure.
Aluminum doors and windows
Aluminum structures and parts are heading 7610, not 7308.
Duty layers
What can sit on a 7308.30.10 / 7308.30.50 entry line
Published US law as of November 25, 2026, for goods of Vietnam. These are the layers an entry can carry, not a duty estimate for your order: the importer of record pays and its broker calculates.
General (column 1) duty
FreeThe rate printed against the HTSUS line, charged as usual on top of Section 232.
Section 232
Annex I-A, 50%Charged on the full customs value since April 6, 2026, at the rate of the annex that lists the line. Vietnam has no lower rate.
Section 301 (Vietnam)
Exempt when 232 appliesThe forced-labor action in force since July 24, 2026 exempts articles subject to Section 232, so a covered line does not stack it.
Antidumping / countervailing
None foundAs of the review date we found no order on fabricated structural steel from Vietnam. Your broker checks each line before entry.
Fees
Charged as usualThe merchandise processing fee and, at seaports, the harbor maintenance fee are charged on the entry.
Sources: 2026 HTS Revision 23 (USITC) for the general rate; the annexes to Proclamation 11021 for the Section 232 listing. Last reviewed . Rules change often; your broker checks them on the day of entry.
Our part
What we put in the file so your broker can classify
World Steel does not choose your HTS number or file your entry. We give the importer of record and its broker the facts, early and in order.
Commercial invoice
Each line described by what it is, how many and its weight in kg. Any HTS number shown is a reference for your broker, not our classification.
Packing list by piece mark
Every bundle and loose piece with its marks, dimensions in mm and weight in kg, so lines can be matched to the invoice.
Mill test certificates
EN 10204 3.1 certificates with mill, heat number and chemistry: the data behind the alloy steel test and the melt-and-pour report.
Drawings and member schedule
Approval and shop drawings that show what each member is and where it goes, for a broker or a ruling request.
Photos of packed bundles
Pictures of the cargo as loaded, which help a broker describe goods that arrive in many containers.
Country and plant of origin
Fabricated in our plant in Vietnam, with the mill country for every heat of steel on the certificates.
The other lines
Four more HTS lines in a steel package
Questions
7308.30.10 / 7308.30.50 questions from US importers
What is HTS 7308.30.50?
It is the US rate line for doors, windows and their frames and thresholds for doors, of iron or steel other than stainless steel. Statistical suffixes split it into windows and their frames (.15), thresholds for doors (.25) and other (.50). The general rate is free and it is listed in Annex I-A of Proclamation 11021.
What is HTS 7308.30.10?
The line for doors, windows and their frames and thresholds for doors of stainless steel. The general rate is free and it is listed in Annex I-A.
Are sectional and rolling overhead doors under 7308.30?
A steel door leaf or curtain is a door. An electric operator, controls and loose hardware can be classified under other headings, so how a powered door set is entered is decided by your broker from how it is shipped.
Is a framed wall opening a door frame?
Usually not. Jambs, headers and girts that frame an opening are part of the building frame and are read as parts of a structure. A pressed-steel door frame made to receive a door leaf belongs with doors.
Are steel door hardware items 7308?
No. Locks, hinges and closers have their own headings. Fitted to the door they can travel with it; shipped loose, they are separate lines.
Do doors pay the same Section 232 rate as the frame?
For goods of Vietnam, as of the review date, yes: both 7308.30 lines and the 7308.90 frame lines are listed in Annex I-A of Proclamation 11021.
Openings scheduled, marked and weighed
Send the door and window list with the building. We frame the openings, mark every piece to its opening and give your broker a clean schedule.