The line
Two words on the schedule: steel grating
Under subheading 7308.90, after the columns and beams indent, the next indent opens with its own rate line: 7308.90.70.00, steel grating. No further split, one statistical number, kilograms as the unit.
Grating anatomy
Six words a broker may see on our grating lines
Grating is described by its bars, their spacing and the finish. These terms appear on our drawings and packing lists.
Bearing bars
Flat bars set on edge that carry the load across the span. Their depth and thickness set the capacity.
Cross bars
Bars welded or pressed across the top that hold the bearing bars upright and spaced.
Spacing
Bearing bars sit at about 30 mm (1-3/16 in) centers in a common US pattern, and cross bars wider apart.
Banding
A flat bar welded across cut ends and around openings to stiffen the panel edge.
Serrated top
Notched bearing bars for extra grip where floors get wet or oily.
Finish
Hot-dip galvanized to ASTM A123 for outdoor use, or painted to the job specification.
Grating or not
Four floors that count as grating, two that do not
Walkway decks come in several forms. Only bar grating fits the words “steel grating”; the rest are described for what they are.
Welded bar grating panels
Steel grating: 7308.90.70.
GratingPress-locked bar grating
Steel grating: 7308.90.70.
GratingGrating stair treads with nosing and end plates
Made from grating for stairs: commonly 7308.90.70.
GratingTrench and pit covers of bar grating
Steel grating: commonly 7308.90.70.
GratingChecker or floor plate cut to size
Plate, or a part of a structure when prepared for one.
Not gratingExpanded metal sheet
Heading 7314.50, expanded metal.
Not gratingPlatform or panel
Same grating, three ways to ship it
How grating is packed and entered changes how it tends to read. Decide it with your broker before the drawings are released for packing.
Grating panels banded apart from the frame
Grating on its own line, frame members on theirs.
Platform frame with grating clipped on, shipped as one unit
May be entered as a structure or part of one; the broker decides.
A complete skid or module with grating floors
Classified as the module it is, which can be another heading entirely.
Duty layers
What can sit on a 7308.90.70 entry line
Published US law as of November 25, 2026, for goods of Vietnam. These are the layers an entry can carry, not a duty estimate for your order: the importer of record pays and its broker calculates.
General (column 1) duty
FreeThe rate printed against the HTSUS line, charged as usual on top of Section 232.
Section 232
Annex I-A, 50%Charged on the full customs value since April 6, 2026, at the rate of the annex that lists the line. Vietnam has no lower rate.
Section 301 (Vietnam)
Exempt when 232 appliesThe forced-labor action in force since July 24, 2026 exempts articles subject to Section 232, so a covered line does not stack it.
Antidumping / countervailing
None foundAs of the review date we found no order on fabricated structural steel from Vietnam. Your broker checks each line before entry.
Fees
Charged as usualThe merchandise processing fee and, at seaports, the harbor maintenance fee are charged on the entry.
Sources: 2026 HTS Revision 23 (USITC) for the general rate; the annexes to Proclamation 11021 for the Section 232 listing. Last reviewed . Rules change often; your broker checks them on the day of entry.
Our part
What we put in the file so your broker can classify
World Steel does not choose your HTS number or file your entry. We give the importer of record and its broker the facts, early and in order.
Commercial invoice
Each line described by what it is, how many and its weight in kg. Any HTS number shown is a reference for your broker, not our classification.
Packing list by piece mark
Every bundle and loose piece with its marks, dimensions in mm and weight in kg, so lines can be matched to the invoice.
Mill test certificates
EN 10204 3.1 certificates with mill, heat number and chemistry: the data behind the alloy steel test and the melt-and-pour report.
Drawings and member schedule
Approval and shop drawings that show what each member is and where it goes, for a broker or a ruling request.
Photos of packed bundles
Pictures of the cargo as loaded, which help a broker describe goods that arrive in many containers.
Country and plant of origin
Fabricated in our plant in Vietnam, with the mill country for every heat of steel on the certificates.
The other lines
Four more HTS lines in a steel package
Questions
7308.90.70 questions from US importers
What is HTS 7308.90.70?
It is the US rate line for steel grating, within subheading 7308.90 for other structures and parts of iron or steel. The general rate is free, the unit of quantity is kg, and it is listed in Annex I-A of Proclamation 11021.
Is checker plate classified as steel grating?
No. Checker or floor plate is a solid plate, not grating. Shipped as plate it is a flat-rolled product; cut and prepared for a structure it can read as a part of a structure. Your broker decides from the facts.
Is expanded metal grating under the HTSUS?
No. Expanded metal has its own heading, 7314.50, even when it is used as a walkway.
Does galvanizing change the HTS code of grating?
No. Hot-dip galvanizing is a finish. Galvanized bar grating is still steel grating.
Are grating stair treads 7308.90.70?
Treads made from bar grating, with a nosing and end plates, are commonly read as steel grating when entered on their own. Stair stringers and landings are parts of a structure.
Does World Steel supply grating with its platforms?
Yes. Grating or plate decking is supplied as your specification calls for, with platforms, walkways, stairs and equipment floors, detailed and packed with the frame.
Platforms, walkways and the grating on top
Send the layout. We frame and deck it, galvanize where the job needs it, and mark every panel to its bay for your broker and your erector.