Route
Where Bermuda steel lands
Port of Hamilton
The commercial port on Hamilton Harbour.
City of Hamilton
Tight city sites a short haul from the docks.
West to Dockyard
The road through Paget, Warwick, Southampton and Sandys.
East to St George’s
The road past Flatts and the Causeway to St David’s and the old town.
Packing
Packed for narrow roads
Member lengths
Lengths and splices planned for the roads to your site.
Erection order
Bundles follow the erection sequence, floor by floor.
Piece marks
Every member marked to the erection drawings before it ships to Hamilton.
Timed releases
Shipments released to match tight sites with little laydown.
Who does what
Shipping work, split clearly
World Steel supplies
- Packing in erection order with piece marks for Hamilton
- Member lengths planned for the route
- Packing lists and shipping documents
- Wood packaging treated for export to Bermuda where used
- Shipment tracking in PEB Studio
The contractor or importer arranges
- Import clearance and duties
- Port charges and haulage permits
- Unloading and storage
- Cranes on site
- Erection
Bermuda
What we do not claim
Bermuda is supplied FOB Vietnam or CIF Hamilton only, and we do not publish prices or duty rates. A typical sailing from the Vietnamese port to Hamilton takes about 45 days; the route and costs are confirmed in each quotation.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Bermuda has 9 parishes. Open Paget, Pembroke or Devonshire to see the local wind, ground and coast, the road from Hamilton and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Bermuda project is cut, welded, inspected and packed.
Caribbean logistics
Ports for Bermuda: shipped from our plant in Vietnam
Shipping guides: Ocean routes from Vietnam · Transshipment hubs and feeders · Customs and import papers
Q&A
What Bermudian buyers ask
Which port does steel for Bermuda use?
The port of Hamilton, on the harbour front of the capital.
Can long members reach our site?
We check the route and plan lengths and splices for it. Your haulier confirms any permits.
Who clears the steel through customs?
The importer of record in Bermuda, usually the contractor or owner, with a customs broker. We supply the commercial documents.
Bermuda solutions
Every Bermuda guide
Related pages
Code facts on this page summarize practice in Bermuda and the standards it references. They are not legal or engineering advice; your engineer of record and the Department of Planning confirm the code and edition in force for your project.
Contact World Steel · Bermuda
Talk to us about steel for Bermuda
WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.