Anatomy
Five parts of a roller shutter
- Barrel and coilSlats wind onto a drum above the opening
- Slat curtainInterlocking steel slats, coated and painted
- GuidesSteel guides fixed to the jambs
- HoodCovers the coil, outside or inside
- OperatorManual chain or electric motor
Doors are made by partner plants in Vietnam and shipped with your steel. World Steel frames the openings; your US contractor installs.
Why it pays
Wide bays, hard use
Almost no headroom
The coil sits above the opening.
Wide bays
Large openings for trucks and equipment.
Tough curtain
Steel slats for hard daily use.
Framed in the design
Loads from the door go into the frame.
- Door scheduleSizes, operation and positions.
- Openings framedJambs and headers in the steel design.
- Doors from partnersMade by partner plants in Vietnam.
- One shipmentDoors travel with the steel.
Specification
Roller shutters at a glance
- Type
- Coiling steel slat doors, manual or motorized
- Maker
- Supplied through partner plants in Vietnam
- Opening framing
- Jambs, header and bracing in our steel design
- Finish
- Coated slats, colors per the maker’s range
- Wind and impact
- Only as shown by test data for the chosen door, confirmed per project
- Install
- By your US contractor, from the maker’s instructions
Photo
PhotoWhere it goes
Buildings with big openings
Questions
Roller shutter questions
Who makes the roller shutters?
Partner plants in Vietnam that World Steel works with. They ship in the same container plan as your steel, so the doors and the openings match.
Are your roller shutters wind-rated for Florida or the coast?
Not as a general claim. No wind-load test data is published for these doors. Where a wind or impact rating is required, your designer specifies a tested door and we confirm the data per project or advise a local supplier.
Do you install the doors?
No. World Steel designs, fabricates and supplies. Your US contractor installs the doors from the maker’s instructions.
Can they be motorized?
Yes, with an electric operator. Power and controls are wired on site by your contractor’s electrician.
More doors and openings: Industrial Overhead Doors · Personnel Doors · Access Doors · Windows · Skylights · Door Frames · Opening Reinforcement Steel
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Roller Shutter Doors
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions