Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St. Catherine parish · Jamaica

Steel buildings and structural steel for St. Catherine, Jamaica

St. Catherine is Jamaica’s fastest-growing parish: Portmore, the old capital Spanish Town, the Caymanas economic zone and logistics estates on Highway 2000, with alumina works at Ewarton in the north.

County of Middlesex · Parish seat Spanish Town

Site conditions in St. Catherine

What the site asks of your steel

Wind
Open plains and coast
Seismic
High
Flood
Rio Cobre plain
Ground
Soft soils near the coast

Our design note. Large clear-span warehouses and plants on Highway 2000 are the core of St. Catherine’s steel market. We optimize frame spacing and spans for racking and docks, design for wind and seismic loads and ship packages area by area.

St. Catherine at a glance

The ground, the work and the road in

Ground and climate

Flat plains of the Rio Cobre and the coast around Portmore and Old Harbour, rising to hills in the north. Soft coastal soils and flood plains near the rivers.

What gets built

Logistics and warehousing, manufacturing, special economic zones, alumina, housing and retail. The busiest parish for warehouse and plant steel.

Getting steel there

Highway 2000 runs through it; 20 to 45 minutes from the Kingston terminal.

Towns: Spanish Town · Portmore · Old Harbour · Linstead · Ewarton

Steel we recommend

What we fabricate for St. Catherine

The three building types we are asked for most in this parish, made in our own plant in Vietnam and shipped in erection order.

Warehouses and logistics

Clear-span distribution buildings with dock doors and mezzanines.

Warehouse and distribution buildings →

Industrial plants

Portal and crane-bay frames for processing, packaging and manufacturing plants.

Manufacturing plants and crane bays →

Heavy industry and mining

Conveyor galleries, pipe racks, process buildings and maintenance shops.

Heavy industrial plants →

Contractors in St. Catherine

You win the job in St. Catherine. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St. Catherine

Can you supply a large warehouse near Spanish Town or Caymanas?

Yes. Clear spans with dock doors, mezzanines and racking loads, released area by area for phased construction.

How far is St. Catherine from the port?

Twenty to forty-five minutes from the Kingston terminal on Highway 2000, which keeps delivery simple.

County of Middlesex

Other parishes in Middlesex

The middle: Spanish Town, the bauxite plateau and the north coast resorts.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the Jamaica National Building Code. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Jamaica

Talk to us about steel for St. Catherine

Send the drawings or the site, size and use. We design or detail the steel for St. Catherine’s wind, seismic and coastal conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Kingston. WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.