Site conditions in St. Ann
What the site asks of your steel
- Wind
- North coast hurricane exposure
- Ground
- Karst limestone, sinkholes
- Air
- Salt along the resorts
- Seismic
- Moderate
Our design note. Resort projects in St. Ann need multi-storey frames, long-span ballrooms and coastal coatings; bauxite works need heavy process steel. Both benefit from steel’s light weight on karst ground.
St. Ann at a glance
The ground, the work and the road in
Ground and climate
Limestone plateau and hills behind a coral coast. Karst ground with sinkholes in places, so the soil report matters.
What gets built
Tourism and attractions, bauxite mining and shipping, cattle and farming, retail and services for Ocho Rios.
Getting steel there
End of the North-South Highway at Ocho Rios; about an hour and a half from the Kingston terminal.
Towns: Ocho Rios · St. Ann’s Bay · Runaway Bay · Discovery Bay · Brown’s Town
Steel we recommend
What we fabricate for St. Ann
The three building types we are asked for most in this parish, made in our own plant in Vietnam and shipped in erection order.
Hotels and resort buildings
Multi-storey steel frames and long-span roofs for resorts and attractions.
Multi-story steel buildings →Heavy industry and mining
Conveyor galleries, pipe racks, process buildings and maintenance shops.
Heavy industrial plants →Commercial buildings
Retail stores, showrooms, offices and mixed-use blocks.
Commercial steel buildings →Contractors in St. Ann
You win the job in St. Ann. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in St. Ann
Do you supply steel for hotels in Ocho Rios?
Yes. Multi-storey steel frames with composite floors, long-span roofs and service buildings, designed for coastal wind.
Is karst ground a problem for steel buildings?
It needs a good soil investigation. A light steel frame helps, and we design to the foundation layout your engineer sets.
County of Middlesex
Other parishes in Middlesex
The middle: Spanish Town, the bauxite plateau and the north coast resorts.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the Jamaica National Building Code. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Jamaica
Talk to us about steel for St. Ann
Send the drawings or the site, size and use. We design or detail the steel for St. Ann’s wind, seismic and coastal conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Kingston. WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.