Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Jamaica · Earthquakes

Earthquake-resistant steel frames for Kingston and eastern Jamaica

The 1692 earthquake sank much of Port Royal and the 1907 earthquake destroyed downtown Kingston. Jamaica sits on the boundary of the Caribbean and North American plates, and the faults that cross the east of the island set the highest seismic loads around Kingston, St. Andrew, St. Thomas and Portland. Steel, designed to bend without breaking, is the material of choice for buildings that must stay standing.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Kingston or Montego Bay.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Highest loads
Kingston and the east
Steel design
AISC 341 where required
Welding
AWS D1.8 qualified
Our part
Ductile details, checked welds

Why steel

Bend, do not break

A well-detailed steel frame absorbs earthquake energy by yielding in chosen places, while the rest of the structure stays elastic. That is why seismic codes allow lighter loads for ductile steel systems than for brittle ones.

The ductility only works if the details are right: compact sections, braced flanges, protected zones kept free of attachments and welds made by qualified welders to qualified procedures.

Systems we fabricate

Seismic frames for Jamaican buildings

Ordinary and intermediate moment frames

Portal frames for warehouses and plants, the common choice outside the highest zones.

Concentrically braced frames

Efficient bracing for multi-storey buildings and plants with heavy equipment.

Special moment frames

For tall or critical buildings around Kingston, with prequalified connections.

Built-up columns and girders

Welded sections made to the exact size the design needs.

Who does what

Seismic work, split clearly

World Steel supplies

  • Frames detailed to AISC 341 where the design calls for it
  • AWS D1.8-qualified procedures and welders
  • Protected zones marked on request
  • Plate with EN 10204 3.1 certificates, Charpy tests on request
  • Remote or in-person inspector access

In Jamaica, the contractor and the engineer of record arrange

  • Site class and the seismic design category
  • Approval of the seismic system
  • Foundations and anchor design
  • Special inspections on site
  • Erection to the drawings

Jamaica

What we do not claim

We do not certify buildings for an earthquake. The seismic design is approved by your engineer of record for the site class and loads set under the Jamaica National Building Code.

Products and solutions

The World Steel pages behind this guide

Jamaica parish by parish

How this applies in your parish

Jamaica has 14 parishes. Open St. Catherine, Clarendon or Manchester to see the local wind, ground and coast, the road from Kingston and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Jamaican project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

Q&A

What Jamaican buyers ask

Is all of Jamaica a high seismic zone?

The whole island has seismic loads, highest in the east around Kingston. Your engineer sets the design category for the site from the code maps and the soil report.

Do you weld to AWS D1.8?

Yes. Our shop has AWS D1.8-qualified welding procedures and welders for demand-critical welds in seismic frames.

Can our inspector check the welds?

Yes. Your inspector is welcome in our plant in person or live online, and every weld check is recorded member by member.

Official sources: Earthquake Unit, University of the West Indies Mona

Contact World Steel · Jamaica

Talk to us about steel for Jamaica

WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.