Traceability
From the mill to your bundle, one unbroken record
The heat number logged at intake follows the steel through every station, so a member on your site leads back to its certificate.
-
Mill Vietnamese mill issues the EN 10204 3.1 certificate with chemistry and mechanical tests
-
Heat number Logged at intake against the certificate, grade and thickness
-
Plate or shape Racked by grade and heat number in the store
-
Cut part Piece mark and ID code written on the part at cutting
-
Member Member record in PEB Studio keeps the heat numbers of its parts
-
Bundle Bundle QR links back to every member inside it
At the gate
Six checks before steel reaches the cutting floor
- Certificate against the delivery
Grade, heat number, dimensions and quantity on the mill certificate are checked against the delivery note and the plate itself.
- Thickness and size
Plate thickness, width and length are measured on arrival, before the material is accepted into the store.
- Surface condition
Laminations, deep pitting, bends and damage are looked for; anything doubtful is held, not used.
- Marking
Each plate keeps a legible heat number or ID code so it can be identified on the cutting bed.
- Storage by grade
Stock is racked by grade and heat number so one grade is never picked for another.
- Hold on doubt
Material without a matching certificate stays on hold until the record is complete.
Your certificate pack
What the material record can include
| EN 10204 3.1 mill certificates | Standard for the plate, rolled shapes and coil in your members |
|---|---|
| Charpy V-notch (CVN) results | Supplied by Vietnam plate mills on request, for seismic or low-temperature specifications |
| Heat number log per member | Kept in PEB Studio and copied into the manufacturing data record |
| Material grade list | US designations your Engineer of Record specified, or the equivalent grades agreed in the quote |
Steel comes mainly from mills in Vietnam, with Japan, Korea, Indonesia or Thailand when a specification calls for it.
Questions
Material and traceability questions
Where does the steel for my order come from?
Mainly from mills and factories in Vietnam, with Japan, Korea, Indonesia or Thailand when your specification calls for a grade or size rolled there. Plate, rolled shapes and coil arrive with their mill certificates and are logged by heat number before any cutting.
Do I get EN 10204 3.1 certificates?
Yes. EN 10204 3.1 mill certificates are standard for the steel in your members, and Vietnam plate mills can add Charpy V-notch results on request when your specification calls for them.
Can you trace a finished member back to its heat?
Yes. The heat number or ID code is carried onto each cut part, and the member record in PEB Studio keeps the heat numbers of its parts, so a bundle QR leads back to the certificates.
What happens to material without a matching certificate?
It is put on hold and not issued to the cutting floor until the certificate and the material agree. Doubtful material is never used to keep a schedule.
Can my inspector review the certificates before fabrication?
Yes. Certificates and the heat log can be shared in PEB Studio, and hold points can be witnessed live on Zoom or Microsoft Teams or by an inspector you appoint.
Related: IAS AC472 accreditation · Digital project control in PEB Studio · Download center
Built for large jobs
Put your next steel package through this station
Material intake is one of eight stations in a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019 and audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a steel list. Our engineers take off the quantities, check the US code basis and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and OEM supply under your brand.
Watch this station work on your own job. Hold and witness points can be attended live on Zoom or Microsoft Teams, and every record is in PEB Studio.
Book an online audit