Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Doors & building openings · Windows

Daylight and a view, cut cleanly into steel

A row of windows turns a metal box into an office, a showroom or a place people enjoy working. The trick is in the wall: each window needs framing between the girts, trims that lap the panels, and a size that fits the panel module. We plan all three on the elevations and supply the windows through partner plants in Vietnam, in the same shipment as the steel.

Metal building wall elevation with a ribbon of windows framed between two girts Header girtSill girt
IllustrationSupplied through partner plants in Vietnam.

Window types

Four ways to open a wall

  • FixedLight and view, no opening
  • SlidingOpens sideways for air
  • AwningHinged at the top, sheds rain when open
  • RibbonA continuous band of glass along the wall

Why it pays

Windows that fit the wall

  • Daylight

    Brighter offices and work areas.

  • Sized to the module

    Fits the panel and girt spacing.

  • Trimmed tight

    Head and sill trims shed water.

  • With the building

    One shipment, matched openings.

How it is planned

Scheduled with the elevations

  1. Window scheduleType, size and position.
  2. Openings framedBetween girts on the elevations.
  3. Windows from partnersPartner plants in Vietnam.
  4. One shipmentWindows travel with the steel.

Specification

Windows at a glance

Type
Aluminum or steel framed windows for metal walls
Maker
Supplied through partner plants in Vietnam
Opening framing
Jambs, header and sill between girts in our design
Trims
Head, jamb and sill trims to lap the panels
Glass and ratings
Impact, wind and thermal values only from test data for the chosen window, per project
Install
By your US contractor

Questions

Window questions

Are your windows impact-rated for hurricane zones?

Not as a general claim. No impact or wind test data is published for these windows. In hurricane zones your designer specifies a tested window; we confirm data per project or your contractor buys locally, and we frame the opening either way.

Can I use windows from a US supplier?

Yes. We frame and trim the openings to the supplier’s rough-opening sizes, and your contractor installs the windows.

Where do windows go in a metal wall?

Between girts, with a header and sill framed in. We place them on the elevations so they line up with the panel module.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Windows

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of doors & building openings, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.