Clear span or one interior column?
Switch between the two frames. The comparison is qualitative: weights for your building come from design.
| Aspect | Clear span | One interior column |
|---|---|---|
| Rafter span | Full building width | About half the width |
| Frame weight | Higher on wide buildings | Usually lower for the same footprint |
| Floor | Fully open | One column line under the ridge |
| Outer foundations | Carry the full frame thrust | Smaller reactions to carry |
| Best when | Every square meter must be free | An aisle or wall can follow the ridge |
Need a fully open floor after all? See clear-span gable frames. Even wider? Try two interior column lines.
Planning
Make the column line disappear
Follow the main aisle
Run the main forklift aisle along the column line, and the columns disappear into the traffic pattern.
Back-to-back racking
A double rack row can wrap the columns, so they take no extra floor.
A future dividing wall
If the building may split into two tenants, the column line is where the wall goes.
Protect the columns
Bollards or guards at aisle ends, planned with the layout, keep forklifts off the steel.
From our company profile
Multi-span frame - 1 interior column
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Built by World Steel
Wide buildings with interior columns



Warehouse 50×140 in Thailand (2023): a World Steel building of about 50 by 140 m (164 by 459 ft). See the project
Questions
One interior column: questions
How much steel does one interior column save?
It depends on the width, loads and eave height, so we do not quote a fixed figure. On wide buildings the saving can be significant, and we show you both options with their weights in design optimization.
Does the interior column have to be at the center?
No. It usually sits under the ridge, but it can be offset to suit an aisle or wall line, with the roof ridge or the rafter design adjusted to match.
Are interior columns tapered like the outer columns?
Interior columns mostly carry vertical load, so they are often slim and constant in depth, either rolled or built-up, as the design requires.
Can I remove the interior column later?
Not without redesigning and strengthening the frame. If you think the floor may need to be fully open one day, choose a clear-span frame from the start.
What foundations do interior columns need?
A footing under each interior column, designed by the foundation engineer from the reactions we provide. Interior column loads are mainly vertical, so the footings are often simple.
Built for large jobs
Multi-span frames with one column line for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included