Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Doors & building openings · Personnel doors

The door everyone uses every day

Big doors move trucks; the personnel door moves people. It is the first thing a visitor touches and the exit staff rely on. We schedule each walk door with its swing, hand, hardware and frame, frame the opening into the wall steel, and supply the doors through partner plants in Vietnam so they arrive with the building.

Elevation of a steel walk door with frame, vision lite, panic bar and swing arc
IllustrationHardware shown is an example set.

Door schedule, set per door

Size
915 x 2134 mm (3 ft x 7 ft) is common; others to order
Leaf
Single or pair, hollow metal
Swing and hand
Set per door on the schedule
Hardware
Hinges, lockset, closer, panic bar where needed
Vision lite
Optional glass panel
Frame
Steel frame fixed to framed jambs

Why it pays

Doors that arrive ready to hang

  • Scheduled door by doorSwing, hand and hardware set.
  • Framed with the girtsNo field cutting of the wall.
  • Exit hardwarePanic bars where your code needs them.
  • Ships with the buildingDoors arrive with the steel.
Insulated sectional door seen from inside a steel buildingPhoto
Exported steel in place in Japan: a World Steel job abroad, shown for the building type rather than a US site.
Finished steel building in blue wall panels with a walk-in doorPhoto
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.

How it is planned

Scheduled, framed, packed by mark

  1. Door scheduleEvery door with its hardware.
  2. Openings framedOn the wall elevations.
  3. Doors from partnersPartner plants in Vietnam.
  4. Packed by door markEasy to find on site.

Specification

Walk doors at a glance

Type
Hollow metal walk doors with steel frames
Maker
Supplied through partner plants in Vietnam
Opening framing
Jambs and header girts in our wall design
Hardware
Scheduled per door; to the hardware set your designer picks
Fire or wind rating
Only from listed or tested data for the chosen door, per project
Install
By your US contractor

Where it goes

Every building has one

Questions

Walk door questions

Which door sizes can you supply?

Common US sizes such as 915 x 2134 mm (3 ft x 7 ft) and pairs, plus other sizes to order. Each door is set on the schedule.

Are the doors fire-rated?

Only where the chosen door and frame carry a listing for that rating, confirmed per project. We do not claim ratings in general.

Can hardware match US specs?

Hardware is scheduled to the set your designer chooses. Where a specific US brand is required, your contractor can buy it locally and we prepare the doors to suit.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Personnel Doors

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of doors & building openings, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.