In our plant
How a curved rafter is made
The curve comes from the cutting table, not a bending machine.
Web cut to the curve
The web plate is cut on CNC machines to the radius in the model. The curve is cut, not bent.
Flanges welded on
Flanges follow the curved web and are welded to it, with the welding order set to control distortion.
Checked against the model
Curve, length and end-plate positions are measured before the rafter is released.
Bolted at the column
The two arches meet over the interior column with a bolted end-plate connection.
More on curved members: curved and cambered members and CNC and laser cutting in our plant.
Arch or straight
What the curve changes
A softer roofline
A curve reads well from the street and suits showrooms, halls and public buildings.
Rain and snow shed smoothly
There is no ridge to flash; the curve sheds water toward the eaves.
Panels to match
The roof panel and purlin spacing are chosen to follow the curve, crimp-curved or straight panels on a curved line.
Moderate rafter sizes
With an interior column, each arch spans half the width, which keeps rafters and foundations moderate.
For a curved roof with no interior column, see arched roof trusses.
Curved steel by World Steel
Curved rafters on a finished building



Curved steel roof by World Steel at Goldfields Arts Centre, Western Australia: shown for the curved rafters, a different frame layout. See the project
From our company profile
Arched roof - 1 interior column
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Questions
Arched roof questions
Are curved rafters bent or cut?
Cut. The web plate is cut to the curve on CNC machines from the model and the flanges are welded to it, so the shape matches the drawing without bending heavy sections.
Is an arched roof more expensive than a straight gable?
A curved rafter takes more cutting and fit-up than a straight one, and the roof panels must suit the curve. With one interior column the rafters stay moderate, which helps. We price both shapes if you want to compare.
What roof panels work on an arched roof?
Panels that can follow the curve, either crimp-curved in a factory or straight panels laid on a gentle radius. The choice depends on the radius, and the purlin spacing is set with it.
Why have an interior column under an arched roof?
It halves the span of each arch. That keeps rafters, knees and foundations smaller than a single arch over the whole width would need.
Can an arched roof carry snow?
Yes. ASCE 7 gives specific snow load patterns for curved roofs, including unbalanced loads, and the rafters are designed for them.
Built for large jobs
Arched roofs on one interior column for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included