Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Ventilation & building services · Lighting supports

Lights where the plan says, not where the purlins are

A lighting designer lays out fixtures for even light on the floor. Purlins follow the roof. The two rarely line up. We supply struts, hanger frames and brackets that carry each fixture where it belongs and connect back to the building frame at points we have checked, so your electrician mounts lights instead of improvising supports.

IllustrationFixtures on struts, placed by the lighting plan.

Mounts

Three ways to hang a light

Strut runsContinuous struts across purlins for rows of fixtures.
Hanger framesDrop frames for fixtures below cranes or ducts.
BracketsWall and column brackets for perimeter and area lights.

Why it pays

Even light, faster fit-out

  • Even light

    Fixtures where the design wants them.

  • Frame checked

    Every hanger point verified.

  • Faster fit-out

    Supports ready on day one.

  • One package

    Shipped with the building.

MembersStruts, hanger frames and brackets
DesignAISC 360; fixture anchorage per ASCE 7 Chapter 13
InputsLighting plan from your electrical engineer
AttachmentTo purlins or frames at checked points
FinishPainted or galvanized
ScopeSupport steel only; fixtures and wiring by your electrician
  1. Lighting planFixture positions and weights.
  2. Supports detailedOn the shop drawings.
  3. FabricatedStruts, frames and brackets.
  4. Shipped markedBy bay and grid.

Where it goes

Tall, wide spaces that need light

Space-truss roof being erected over a large food processing hallPhoto
Space-truss roof under erection on a World Steel job in southern Vietnam.
Warehouse frame from above, purlins and girts fixed to the rafters and columnsPhoto
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

Questions

Lighting support questions

Why not hang lights straight from the purlins?

Sometimes you can. But fixture positions rarely match purlin spacing, and heavy fixtures can overload light purlins. Struts and hanger frames put lights where the plan wants them on framing we have checked.

Who supplies the fixtures?

Your electrical contractor. We design and fabricate the support steel only.

When do you need the lighting plan?

Before shop drawings, so the supports are detailed with the building.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Lighting Support Structures

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of ventilation & building services support, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.

Covered in our state guides