In the US market
Pump stations, lift stations, generator buildings and switchgear enclosures are being replaced and hardened across the country. Many have to keep working through storms, floods and heat waves.
Small buildings, critical jobs
Utility buildings are small, but they protect equipment a whole community depends on. We design them from the equipment outward.
Frames for pumps, generators and switchgear, sized from the equipment weights and vibration.
Coatings chosen for damp and chemical rooms, applied and checked in our plant.
Framed openings for equipment removal, ventilation and secure access.
Anchor rods designed for the wind and seismic forces of the assigned risk category.
Pump stations, lift stations, generator buildings and switchgear enclosures are being replaced and hardened across the country. Many have to keep working through storms, floods and heat waves.
Frames designed for equipment loads and the risk category your Engineer of Record assigns, protection suited to wet or chemical interiors, secure doors and louvers, and clear access for maintenance crews.
Compact, fully bolted steel packages that ship efficiently, with the protection system specified for the exposure and maintenance guidance included in the handover documents.
Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Solutions · End to end
One partner carries your utilities & infrastructure building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Utilities & Infrastructure ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
How we workSolutions
State guides
Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
Pump stations, treatment plant buildings, blower and chemical buildings, maintenance shops, equipment shelters and covered storage.
Yes, when your Engineer of Record assigns a higher risk category; the frame and anchorage are then designed to it.
Yes. Removable roof panels, hatches and monorail beams are framed so pumps and motors can be lifted out for service.
Yes. Hoist and monorail loads from their suppliers are added to the design, and the beams are fabricated with the frame.
With a coating system chosen for the exposure and applied in our plant, with film thickness recorded for each lot.
Your engineer sets the chemical exposure; we supply a coating or galvanizing system for it and detail connections to avoid trapped liquid.
Where your specification needs them, dissimilar metals are separated in the details. Every item we supply is made in Vietnam.
Yes. The handover file includes the coating systems applied and maintenance guidance, so the owner can plan inspections.
As compact bolted kits that pack efficiently, with maintenance guidance in the handover documents.
Yes. Repeated stations can be fabricated from one design with loads re-checked per site. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month.
Mill certificates traced to heat numbers, weld and coating inspection results and a Manufacturing Data Record, under our IAS AC472 quality program.
Yes. PEB Studio shows every member’s status in real time, and witness points can be attended in person or remotely.
No. World Steel designs, fabricates and supplies. Erection and site work are the scope of the US contractor, our customer.
Your Engineer of Record reviews and approves our calculations and drawings, and the PE seal and permits stay with the US team.
Those programs can carry steel sourcing rules. The contractor confirms them with the funding agency before we quote; we make no eligibility claim.
The building size, equipment and hoist loads, exposure or coating specification, the site address and the utility’s standards.
Neighboring industries
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.