Shipping simulator · Vietnam to the Caribbean

Watch your steel sail from our plant in Vietnam to your Caribbean port

Pick a Caribbean port and an Incoterm. The simulation follows one container from packing at World Steel’s plant, about 2 hours by road to the export terminal, then about 45 days at sea across the Pacific and through the Panama Canal to your island, and shows who pays and who carries the risk at every stage.

≈ 2 hby road from our plant to the Vietnamese port
≈ 45 daysat sea, Vietnamese port to your Caribbean port
34Caribbean ports you can pick

Voyage simulatorDemonstration

Incoterm
Chart 1 · Vietnam to Panamaabout 10,000 nmi
Chart of the Pacific Ocean with the illustrative sea lane from Cai Mep in Vietnam to the Panama Canal, about 10,000 nautical miles. Cai Mep our plant ≈ 2 h by road Panama Canal North Pacific Ocean
Stage
Discharged at your Caribbean port
Sailed
11,100 / 11,100 nmi
Who pays
Split
Risk with
You, since loaded on board in Vietnam
Chart 2 · Caribbean SeaPort of Spain: about 1,120 nmi
Chart of the Caribbean Sea with the illustrative lane from the Panama Canal to Port of Spain. Every pin is a Caribbean port you can simulate. Panama Canal Port of Spain

45days at sea · arrived

Voyage clock: about 45 days from loading in Vietnam to discharge at your Caribbean port on a typical sailing. The days in between are paced for the demonstration; the carrier confirms each sailing at booking.

  1. Packed and sealed at our plant

    Hai Son Industrial Park, Tay Ninh, Vietnam

    World Steel
  2. About 2 hours by road to the port

    Plant gate to Cai Mep or Cat Lai

    World Steel
  3. Risk passes

    Loaded on board in Vietnam

    Cai Mep or Cat Lai · day 0

    World Steel
  4. Across the Pacific

    South China Sea to Panama

    World Steel
  5. Through the Panama Canal

    Pacific to Caribbean locks

    World Steel
  6. Across the Caribbean Sea

    Canal to your island

    World Steel
  7. Discharged at your Caribbean port

    About 45 days after loading

    Split
  8. Delivered to the job site

    Truck, barge or landing craft

    You

The container is discharged and your customs broker lodges the declaration with the papers we sent ahead.

≈ 45days at sea
Pacific, about 10,000 nmi Caribbean Sea to Port of Spain, about 1,120 nmi

One voyage clock

What the 45 days cover

About 45 days is a typical sailing from the Vietnamese port to your Caribbean port. The ring shows how the miles split; the carrier sets the routing and confirms the sailing at booking.

Starts on board in Vietnam

The clock starts when the container is loaded at Cai Mep or Cat Lai, about 2 hours by road from our plant.

Pacific crossing

Roughly nine in every ten miles of the voyage are the Pacific, from the South China Sea to Panama.

Canal and hub

The Panama Canal transit, and for a small island the relay at a hub onto a feeder.

Ends at your port

The clock stops when the container is discharged at your Caribbean port. Customs and site delivery follow.

Voyage calendar

Pick the day your containers load in Vietnam and see roughly when they reach the Caribbean. A planning sketch only: customs and site delivery come after.

Loaded in Vietnam on day 0, at your Caribbean port about 45 days later.

Caribbean ports

Simulate any of 34 Caribbean ports

About 45 days from Vietnam for each, on a typical sailing. The figure beside each port is the length of our illustrative lane from Cai Mep, through the Panama Canal, in nautical miles: from about 10,600 to 11,700 nmi.

Bermuda lies off the Caribbean chart: see steel delivery to Bermuda. A box for a smaller island is often relayed at a hub: transshipment hubs and feeders.

Incoterms® 2020 on the route

FOB or CIF: the same 45-day voyage, two hand-overs

In the Caribbean World Steel supplies on two terms only, FOB and CIF. The color shows who pays each of the eight stages from our plant to your site, and the red mark shows where the risk passes to you. Press Simulate to watch it on the route.

FOBFree On Board · Commonly quoted

Our plantAbout 45 days at seaYour site

Risk passes: when the steel is on board the vessel at the named Vietnamese port.

CIFCost, Insurance and Freight · Commonly quoted

Our plantAbout 45 days at seaYour site

Risk passes: when the steel is on board in Vietnam. From then on, the policy we bought protects you.

World Steel pays You pay Carriage contract decides Split inside the stage

PEB Studio

The simulation is a demo. Your containers are tracked for real.

On a World Steel job every container you just watched appears in your own PEB Studio project, released status by status with its records: what is inside, how it was braced, which seal is on the door and which vessel is carrying it to your island. Your team follows it in real time, without waiting for an email.

  • Container packing report

    Seal number, verified gross mass, photos and video of each container.

  • Papers for your broker

    Invoice, packing lists, bill of lading, origin and mill certificates sent ahead.

  • Status by stage

    Packed, sealed, on board, relayed, discharged, each with its own records.

  • Ready for the crane

    Readiness per erection step, so the contractor books crews against facts.

At our plant in Vietnam

Where every Caribbean voyage starts

Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Caribbean shipping questions

Shipping simulator questions

How long does shipping from Vietnam to the Caribbean take?

About 45 days on a typical sailing, from loading on board at Cai Mep or Cat Lai in Vietnam to discharge at your Caribbean port. The carrier confirms each sailing at booking and your project manager forwards it.

How long from your plant to the Vietnamese port?

About 2 hours by road from our plant in Tay Ninh Province to the container terminal, depending on the terminal and traffic. Trucks are timed to the booking cut-off.

Does the 45 days include customs and delivery to my site?

No. The 45 days run from the Vietnamese port to your Caribbean port. Customs clearance by your broker and delivery from the port to the site come after, and depend on the island and the site.

Which route does the ship take?

Usually across the Pacific and through the Panama Canal into the Caribbean Sea. The carrier sets the routing on each service; the lanes on this page are illustrative and measured in nautical miles.

My island is small. Is the steel relayed?

Often, yes. A container for a smaller island is usually relayed at a hub such as Kingston, Caucedo, Freeport or Point Lisas onto a feeder. We book the service that calls at or relays to your port.

Is the simulation my actual shipment?

No. It shows how a World Steel shipment moves and how the Incoterm in your contract splits the costs and risk. Your real containers appear in your PEB Studio project, each status with its own photos and records.

Where does the risk pass to me?

In the Caribbean we supply on FOB or CIF only, and under both it passes once the steel is on board in Vietnam, even under CIF, where World Steel pays the freight and insurance to your port.

Which trade terms do you offer in the Caribbean?

FOB or CIF, named in each quotation. Under FOB you book the ocean freight from Cai Mep or Cat Lai; under CIF World Steel books and pays the freight and the marine insurance to your Caribbean port. Customs and delivery from the port are the importer’s.

Who erects the building when it arrives?

The contractor, our customer. World Steel designs, fabricates and supplies the steel structure and ships it in erection order; receiving, unloading and erection on site are the contractor’s scope.

Keep reading

Ready to plan the real voyage?

Send the drawings or the island, size and site date. We name the port, the hub if one is needed and the trade term, and plan production backward from your site date, from a plant that fabricates 2,500 metric tons of structural steel a month.