- Stage
- Discharged at your Caribbean port
- Sailed
- 11,300 / 11,300 nmi
- Who pays
- You
- Risk with
- You, since loaded on board in Vietnam
45days at sea · arrived
Voyage clock: about 45 days from loading in Vietnam to discharge at your Caribbean port on a typical sailing. The days in between are paced for the demonstration; the carrier confirms each sailing at booking.
-
Packed and sealed at our plant
Hai Son Industrial Park, Tay Ninh, Vietnam
World Steel -
About 2 hours by road to the port
Plant gate to Cai Mep or Cat Lai
World Steel -
Risk passes
Loaded on board in Vietnam
Cai Mep or Cat Lai · day 0
World Steel -
Across the Pacific
South China Sea to Panama
You -
Through the Panama Canal
Pacific to Caribbean locks
You -
Across the Caribbean Sea
Canal to your island
You -
Discharged at your Caribbean port
About 45 days after loading
You -
Delivered to the job site
Truck, barge or landing craft
You
The container is discharged and your customs broker lodges the declaration with the papers we sent ahead.
One voyage clock
What the 45 days cover
About 45 days is a typical sailing from the Vietnamese port to your Caribbean port. The ring shows how the miles split; the carrier sets the routing and confirms the sailing at booking.
Starts on board in Vietnam
The clock starts when the container is loaded at Cai Mep or Cat Lai, about 2 hours by road from our plant.
Pacific crossing
Roughly nine in every ten miles of the voyage are the Pacific, from the South China Sea to Panama.
Canal and hub
The Panama Canal transit, and for a small island the relay at a hub onto a feeder.
Ends at your port
The clock stops when the container is discharged at your Caribbean port. Customs and site delivery follow.
Voyage calendar
Pick the day your containers load in Vietnam and see roughly when they reach the Caribbean. A planning sketch only: customs and site delivery come after.
Loaded in Vietnam on day 0, at your Caribbean port about 45 days later.
Caribbean ports
Simulate any of 34 Caribbean ports
About 45 days from Vietnam for each, on a typical sailing. The figure beside each port is the length of our illustrative lane from Cai Mep, through the Panama Canal, in nautical miles: from about 10,600 to 11,700 nmi.
- Point Lisas Simulate ≈ 11,200 nmi
- Port of Spain Simulate ≈ 11,100 nmi
- Georgetown Simulate ≈ 11,500 nmi
- Paramaribo Simulate ≈ 11,700 nmi
- Bridgetown Simulate ≈ 11,200 nmi
- Belize City Simulate ≈ 10,700 nmi
- Willemstad Simulate ≈ 10,700 nmi
- Barcadera Simulate ≈ 10,600 nmi
- George Town Simulate ≈ 10,600 nmi
- St John’s Simulate ≈ 11,200 nmi
- St George’s Simulate ≈ 11,100 nmi
- Kingstown Simulate ≈ 11,100 nmi
- Roseau Simulate ≈ 11,200 nmi
- Basseterre Simulate ≈ 11,100 nmi
- Pointe Blanche Simulate ≈ 11,100 nmi
- Road Town Simulate ≈ 11,100 nmi
- Providenciales Simulate ≈ 10,900 nmi
- Road Bay Simulate ≈ 11,100 nmi
- Little Bay Simulate ≈ 11,100 nmi
Bermuda lies off the Caribbean chart: see steel delivery to Bermuda. A box for a smaller island is often relayed at a hub: transshipment hubs and feeders.
Incoterms® 2020 on the route
FOB or CIF: the same 45-day voyage, two hand-overs
In the Caribbean World Steel supplies on two terms only, FOB and CIF. The color shows who pays each of the eight stages from our plant to your site, and the red mark shows where the risk passes to you. Press Simulate to watch it on the route.
FOBFree On Board · Commonly quoted
Risk passes: when the steel is on board the vessel at the named Vietnamese port.
CIFCost, Insurance and Freight · Commonly quoted
Risk passes: when the steel is on board in Vietnam. From then on, the policy we bought protects you.
PEB Studio
The simulation is a demo. Your containers are tracked for real.
On a World Steel job every container you just watched appears in your own PEB Studio project, released status by status with its records: what is inside, how it was braced, which seal is on the door and which vessel is carrying it to your island. Your team follows it in real time, without waiting for an email.
-
Container packing report
Seal number, verified gross mass, photos and video of each container.
-
Papers for your broker
Invoice, packing lists, bill of lading, origin and mill certificates sent ahead.
-
Status by stage
Packed, sealed, on board, relayed, discharged, each with its own records.
-
Ready for the crane
Readiness per erection step, so the contractor books crews against facts.
At our plant in Vietnam
Where every Caribbean voyage starts
Caribbean shipping questions
Shipping simulator questions
How long does shipping from Vietnam to the Caribbean take?
About 45 days on a typical sailing, from loading on board at Cai Mep or Cat Lai in Vietnam to discharge at your Caribbean port. The carrier confirms each sailing at booking and your project manager forwards it.
How long from your plant to the Vietnamese port?
About 2 hours by road from our plant in Tay Ninh Province to the container terminal, depending on the terminal and traffic. Trucks are timed to the booking cut-off.
Does the 45 days include customs and delivery to my site?
No. The 45 days run from the Vietnamese port to your Caribbean port. Customs clearance by your broker and delivery from the port to the site come after, and depend on the island and the site.
Which route does the ship take?
Usually across the Pacific and through the Panama Canal into the Caribbean Sea. The carrier sets the routing on each service; the lanes on this page are illustrative and measured in nautical miles.
My island is small. Is the steel relayed?
Often, yes. A container for a smaller island is usually relayed at a hub such as Kingston, Caucedo, Freeport or Point Lisas onto a feeder. We book the service that calls at or relays to your port.
Is the simulation my actual shipment?
No. It shows how a World Steel shipment moves and how the Incoterm in your contract splits the costs and risk. Your real containers appear in your PEB Studio project, each status with its own photos and records.
Where does the risk pass to me?
In the Caribbean we supply on FOB or CIF only, and under both it passes once the steel is on board in Vietnam, even under CIF, where World Steel pays the freight and insurance to your port.
Which trade terms do you offer in the Caribbean?
FOB or CIF, named in each quotation. Under FOB you book the ocean freight from Cai Mep or Cat Lai; under CIF World Steel books and pays the freight and the marine insurance to your Caribbean port. Customs and delivery from the port are the importer’s.
Who erects the building when it arrives?
The contractor, our customer. World Steel designs, fabricates and supplies the steel structure and ships it in erection order; receiving, unloading and erection on site are the contractor’s scope.
Keep reading
Ready to plan the real voyage?
Send the drawings or the island, size and site date. We name the port, the hub if one is needed and the trade term, and plan production backward from your site date, from a plant that fabricates 2,500 metric tons of structural steel a month.