Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trinidad and Tobago · Energy

Steel for Trinidad’s gas, ammonia, methanol and LNG plants

Trinidad and Tobago is one of the world’s largest exporters of ammonia and methanol and a major LNG producer. The Point Lisas Industrial Estate at Couva, the LNG trains at Point Fortin and the energy services base of the south all run on steel: pipe racks, process structures, compressor houses, warehouses and workshops. Our Long Son petrochemical complex package, 2,000 t, is exactly this kind of work.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Port of Spain or Point Lisas.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Estate
Point Lisas, Couva
LNG
Point Fortin
Reference
Long Son, 2,000 t
Capacity
2,500 t a month

Project types

What we fabricate for the energy sector

Pipe racks

Multi-tier racks, galvanized or painted, released by module.

Process structures

Equipment support structures, platforms, stairs and ladders.

Compressor and pump houses

Crane-served buildings for rotating equipment.

Warehouses and workshops

Spare parts stores, maintenance shops and laydown sheds.

Control and office buildings

Steel frames for control rooms and offices.

Walkways and bridges

Access bridges and pipe bridges across roads and drains.

At scale

Large packages, released by area or module

A turnaround or new plant can run to thousands of tons. We split the steel into release packages by area or module, fabricate them in sequence and ship them so your crew always has the next area on site.

Our references include the Long Son petrochemical complex at 2,000 t, more than 56,000 m² (600,000 sq ft) of oil and gas structures, plus Sunpro Steel at 5,000 t and CPV Food at 2,500 t.

Who does what

Project work, split clearly

World Steel supplies

  • Detailing to the owner’s specifications
  • Fabrication, galvanizing or coating, QC release
  • Mill certificates, weld and coating records
  • Packing by module and shipping to Point Lisas
  • Shop and erection drawings, included

The contractor arranges

  • Owner contract, permits and site safety
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and tie-ins
  • Piping, mechanical and electrical works

Products and solutions

The World Steel pages behind this guide

Municipality by municipality

How this applies in your municipality

Trinidad and Tobago has 15 municipalities. Open Port of Spain, Diego Martin or San Juan-Laventille to see the local wind, ground and coast, the road from Port of Spain and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Trinidad and Tobago project is cut, welded, inspected and packed.

Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.

Q&A

What Trinbagonian buyers ask

Have you fabricated petrochemical steel before?

Yes. Our references include the Long Son petrochemical complex, 2,000 t of steel for more than 56,000 m² of oil and gas structures.

Can you ship modules to Point Lisas?

Yes. We release and pack by module and ship to Point Lisas, planning breakbulk for large pieces.

Do you work with local contractors?

Yes. Contractors in Trinidad and Tobago are our customers: they win the work and erect it, and we design, fabricate and supply the steel.

Official sources: Ministry of Energy and Energy Industries · InvesTT

Contact World Steel · Trinidad and Tobago

Talk to us about steel for Trinidad and Tobago

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port of Spain. Our contact page for Trinidad and Tobago has the ports, the local time and the form.