Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Connections & anchorage · Brackets

A ledge for everything the building has to carry

Crane runways, entrance canopies, walkways, signs and pipe racks all hang off the main frame. Each one needs a bracket, welded where it belongs and strong enough for what it carries, including the push and pull of a crane. We design brackets with the frame, so the columns are sized for them, and weld them on in our shop.

Steel column elevation with brackets carrying a crane runway, a canopy arm, a walkway and a pipe rack Crane runway Canopy Walkway Pipe racks
IllustrationBrackets designed with the frame, welded in our shop.

What brackets carry

Four common loads

  • Crane runwaysRunway beams on column brackets.
  • CanopiesCantilevered canopy arms.
  • WalkwaysGrating walkways off the frame.
  • ServicesPipes, trays and equipment.

Why it pays

Designed in, not added on

  • Designed with the frame

    Columns sized for the load.

  • Welded in the shop

    No field welding.

  • In the right place

    Located on the drawings.

  • Inspected

    Welds checked before shipping.

  1. Attachments listedCranes, canopies, walkways.
  2. Brackets designedWith the frame.
  3. Welded onIn our plant.
  4. Shipped on the columnReady to receive.

Specification

Brackets at a glance

TypesPlate, built-up and stub brackets
DesignLoads from the attachment; frame checked to AISC 360
Crane bracketsVertical, lateral and longitudinal crane forces included
WeldingShop-welded under qualified welding procedures
FinishWith the member it is welded to
ApprovalDrawings reviewed by the US contractor and their Engineer of Record
Primed column with its bolted end plate set on painting standsPhoto
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Tall lattice columns of a crane-served industrial building during erectionPhoto
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.

Questions

Bracket questions

Can brackets be added after the building is up?

Yes, but the frame must be checked for the new load and the bracket may need field welding or bolting. Designing it in from the start is simpler and cheaper.

How are crane brackets different?

They carry moving loads in three directions and repeat millions of times, so the design includes those forces and fatigue where it applies.

Do you supply the crane?

Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Brackets

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Coated frame parts with welded brackets in the paint hall Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.