Keeps them straight
Holds purlins and girts in line during erection.
Stops roll
Restrains the free flange so members do not twist under load.
Shares the load
Ties the run together so it works as a system.
Why it matters
A small part with a big job
Straight lines on the roof
Panels sit flat on purlins that stay in line.
Full purlin strength
Braced members carry the load they were sized for.
Easier erection
Rods hold purlins in position before the sheets go on.
Counted and packed
Rods, nuts and washers by area, nothing short on site.
How it is supplied
Designed, punched, packed
- Bracing designRod lines set with the purlin design.
- Holes on the drawingsPunched into purlins and girts.
- Packed by areaRods cut to length with their nuts.
Specification
Sag rods at a glance
| Item | Threaded steel rods with nuts, or angle sag members where specified |
|---|---|
| Locations | Mid-span or third points of purlins and girts, as designed |
| Finish | Zinc-coated or matched to the framing finish |
| Holes | Rod holes pre-punched in the purlins and girts |
| Design basis | Bracing of cold-formed members to AISI S100 |
| Supplied with | Nuts and washers, packed by roof and wall area |
Photo
PhotoQuestions
Sag rod questions
Why does my roof need sag rods?
Purlins are tall and thin and can twist and roll under load. Sag rods tie them together so each one stays straight and carries its full design load.
Where do sag rods go?
At mid-span or third points of the purlins and girts, as the design requires. The lines are shown on the roof and wall framing plans.
Are sag rods included in the steel package?
Yes. Rods, nuts and washers are counted and packed with the purlins and girts.
More secondary framing: Z Purlins · C Purlins · Wall Girts · Eave Struts · Roof Bracing · Wall Bracing · Secondary Connection Components · Framing Accessories
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Sag Rods
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides