Trim kinds
Every corner and edge covered
- Outside cornerWraps the external corner of two walls.
- Inside cornerCloses a re-entrant corner where walls meet inward.
- Edge trimCovers an exposed panel edge or end.
- Two-color cornerContrasting trim to outline the building.
Why it matters
The corners people notice
Weather sealed
Cut edges covered, gaps closed.
Crisp outline
Clean, straight corners.
Match or contrast
Same color as walls, or a trim color.
Counted by corner
Every corner listed and packed.
How it is made
Folded to fit
- Corners detailedOn the trim drawings.
- FoldedOn our press brake.
- BundledBy corner, with screws.
Specification
Corner trims at a glance
| Material | Same coated and painted coil as the wall panels, or a contrast color |
|---|---|
| Types | Outside, inside and edge trims |
| Fixing | Stitch screws with sealing washers, closures where needed |
| Length | Standard lengths with laps, cut lists on the trim drawings |
| Profiles | Shaped to suit the wall panel profile |
| Packing | Bundled by corner, labeled to the drawings |
Photo
Photo
Photo
Photo
Made in our own plant
IAS AC472-accredited, 2,500 t of steel a month
Questions
Corner trim questions
Can corner trims be a different color?
Yes. Many owners use a contrast trim color to outline the building.
Do corner trims keep out water?
Yes, with closures and sealant where the panel profile needs them.
Are they included with the walls?
Yes, every corner on the drawings is listed and packed with the wall panels.
More walls and cladding: Metal Wall Cladding · Insulated Metal Panels · Single-Skin Wall Panels · Wall Insulation · Wall Flashings · Louvers · Ventilation Openings · Wall Accessories
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Corner Trims
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides