Exposure
Matching the system to the site
Typical choices for Aruba, confirmed with your engineer for each project.
| Site | Typical protection |
|---|---|
| Enclosed, air-conditioned building | Zinc-rich primer and finish coat on sheltered steel |
| Inland sites | Zinc-rich primer, epoxy intermediate, UV-stable polyurethane finish |
| Beachfront hotels | Marine-grade high-build system or duplex |
| Windward east coast and the harbour | Hot-dip galvanizing or duplex systems |
| Open structures and canopies | Hot-dip galvanizing with a UV-stable finish |
In our plant
How coating quality is built in
Blast cleaning
Members for Aruba are blast cleaned to the specified grade before priming.
Trained painters
Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Aruba.
Measured film
Dry film thickness measured and recorded for every member shipped to Aruba.
Brands sold in the region
Jotun, PPG, Carboline, Hempel, Nippon and International Paint, for easy touch-up.
Aruba
After erection
Every bundle shipped to Barcadera carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.
Products and solutions
The World Steel pages behind this guide
Region by region
How this applies in your region
Aruba has 8 regions. Open San Nicolas Noord, San Nicolas Zuid or Noord to see the local wind, ground and coast, the road from Barcadera and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Aruba project is cut, welded, inspected and packed.
Q&A
What Aruban buyers ask
Why is Aruba so hard on steel?
Salt arrives with the wind every day and little rain washes it away, so salt builds up on exposed surfaces. Strong sun adds UV damage to weak finishes.
Should beachfront steel be galvanized?
Exposed steel near the sea often is, or gets a duplex system for the longest life.
Can we buy matching touch-up paint?
Yes. The brands we use are sold across the Caribbean, and each shipment to Barcadera names the products.
Aruba solutions
Every Aruba guide
Related pages
Code facts on this page summarize practice in Aruba and the standards it references. They are not legal or engineering advice; your engineer of record and DIP confirm the code and edition in force for your project.
Contact World Steel · Aruba
Talk to us about steel for Aruba
WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.