Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Aruba · Wind

Trade winds, passing storms and steel buildings in Aruba

The trade winds blow across Aruba from the east almost every day of the year, strong enough to bend the divi-divi trees and to drive the island’s wind farms. Direct hurricane strikes are rare this far south, but storms such as Ivan in 2004 and Matthew in 2016 passed close enough to bring heavy seas, wind and flooding. Tall hotels on the north-west beaches add their own wind effects. We design the whole load path for the wind your engineer sets.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Barcadera.

Six-story steel frame seen from the front, floor deck in place
Going up beside the plant in Vietnam: World Steel framed its own office building.
Wind
Steady trade winds
Storms
Ivan 2004, Matthew 2016 nearby
Tall buildings
Hotel towers
Our part
Load path checked end to end

Where wind wins

Four places we check first

Roof uplift

On roofs in Aruba, edge and corner zones carry much more suction than the middle.

Tall hotels

Drift, bracing and cladding for towers on the open beachfront.

Connections

Purlin cleats, flange braces and anchors carry reversing loads.

Fatigue and vibration

Signs, canopies and light frames that see wind every day.

By site

How the site changes the loads on your steel

Your engineer of record in Aruba confirms the values.

SiteWhat changes
North-west hotel coastTall buildings on open beachfront
Windward east coastFull trade wind and heavy surf
Oranjestad and the south coastMore shelter, harbour exposure
Hills of the interiorExposed ridges near the Hooiberg and Arikok
San NicolasOpen eastern tip near the wind farms

Aruba

What we do not claim

We do not publish wind ratings or certify buildings in Aruba for a hurricane category. The design is checked by your engineer of record for the loads set for your site in Aruba.

Products and solutions

The World Steel pages behind this guide

Region by region

How this applies in your region

Aruba has 8 regions. Open Paradera, Santa Cruz or Savaneta to see the local wind, ground and coast, the road from Barcadera and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Aruba project is cut, welded, inspected and packed.

Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Q&A

What Aruban buyers ask

Does Aruba need hurricane design?

Your engineer sets the design wind speed for the site. Aruba sees fewer hurricanes than the islands to the north, but trade winds and passing storms still govern many roofs and walls.

Do tall hotels need special wind checks?

Yes. Drift, bracing and cladding loads grow with height; your engineer may also call for a wind study on a tall tower.

Do you supply roof and wall cladding too?

Yes. Roof and wall panels, purlins, girts and fixings can ship with the frame, designed for the same wind at your site in Aruba.

Contact World Steel · Aruba

Talk to us about steel for Aruba

WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.