Aruba · Energy and industry

Steel for energy, water and industry in Aruba

An island without rivers makes its own water and power. Aruba runs desalination and power plants, wind farms on its windward coast and solar parks, and has the old refinery area at San Nicolas in the east. New capacity and upgrades need plant buildings, pipe racks, equipment supports and workshops, all exposed to salt air and steady wind.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Barcadera.

Tall lattice columns of a crane-served industrial building during erection
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Water
Desalination
Wind
Windward coast farms
Industry
San Nicolas, Barcadera
Exposure
Salt and wind

What we fabricate

Steel for plants and utilities

Plant buildings

Frames sized for equipment, services and crane access.

Pipe racks

Multi-level racks, galvanized or duplex coated.

Platforms and stairs

Access platforms, stairs and handrail.

Solar canopies

Steel canopies and supports for panels and wind.

Substations

Equipment supports and substation buildings.

Workshops

Portal frames with crane bays for maintenance.

Built for the coast

Galvanized where it counts

Open structures near the sea are where steel corrodes fastest. We galvanize or duplex coat pipe racks, platforms and canopies, and record the coating for every member.

Our laser machines cut plate up to 100 mm thick and drill holes in the same pass, so base plates, gussets and splice plates fit first time on site.

Who does what

Plant work, split clearly

World Steel supplies

  • Steel design or detailing to the code basis agreed for Aruba
  • Fabrication, galvanizing or coating and QC release
  • Pipe racks, platforms, stairs and handrail
  • Packing by area and shipping to Barcadera
  • Shop and erection drawings, included

The contractor arranges

  • Owner contract and permits
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and alignment
  • Mechanical and electrical works

Products and solutions

The World Steel pages behind this guide

Region by region

How this applies in your region

Aruba has 8 regions. Open San Nicolas Zuid, Noord or Oranjestad West to see the local wind, ground and coast, the road from Barcadera and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Aruba project is cut, welded, inspected and packed.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.

Q&A

What Aruban buyers ask

Can you supply pipe racks and platforms?

Yes. Pipe racks, platforms, stairs and handrail, galvanized or duplex coated for the coast.

Can you supply solar canopy steel?

Yes. Canopies and supports designed for panel loads and the wind your engineer sets.

Do you supply overhead cranes for workshops?

Yes, on request, with the building. Runway girders and brackets are fabricated with the frame.

Contact World Steel · Aruba

Talk to us about steel for Aruba

WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.