Project types
What we fabricate for Aruba hotels
Hotel towers
Composite frames with metal deck and studs, floor by floor.
Lobbies and ballrooms
Long-span trusses and girders for column-free rooms.
Villas and low-rise wings
Light frames packed per building.
Retail and restaurants
Clear-span frames for shops and restaurants.
Parking structures
Steel frames for parking decks.
Plant rooms
Steel for chillers, generators and water tanks.
Speed
A frame made while the foundations go in
We fabricate while your site builds the foundations, then ship floor by floor so a tight beachfront site never fills up with steel. Hotels that open for the season gain the most.
Large packages are released by building or by phase. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the code basis agreed for Aruba
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by floor and shipping to Barcadera
- Shop and erection drawings, included
The contractor arranges
- Owner contract and permits
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Region by region
How this applies in your region
Aruba has 8 regions. Open Oranjestad West, Oranjestad Oost or Paradera to see the local wind, ground and coast, the road from Barcadera and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Aruba project is cut, welded, inspected and packed.
Q&A
What Aruban buyers ask
Can you supply a hotel tower floor by floor?
Yes. We release and pack each level in erection order, with composite deck and studs.
Can steel extend an existing hotel?
Often yes. A light steel frame suits additions and new wings beside a hotel that stays open.
Do you work with Aruban contractors?
Yes. Contractors in Aruba are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
Aruba solutions
Every Aruba guide
Related pages
Code facts on this page summarize practice in Aruba and the standards it references. They are not legal or engineering advice; your engineer of record and DIP confirm the code and edition in force for your project.
Contact World Steel · Aruba
Talk to us about steel for Aruba
WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.