Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Oranjestad West · Region

Steel buildings and structural steel for Oranjestad West, Aruba

Oranjestad West is the western half of Aruba’s capital, with the old town centre, its Dutch-style shopfronts, the cruise harbour, the marinas and government offices.

The hotel coast and the capital · Main town Oranjestad

Main town
Oranjestad
Group
The hotel coast and the capital
Main towns
Oranjestad, Cruise harbour
Port
Port of Barcadera

Site conditions in Oranjestad West

What the site asks of your steel

Wind
Harbour exposure
Air
Harbour spray
Ground
Fill near the waterfront
Sites
Tight town lots

Our design note. Oranjestad West builds offices, shops and harbour buildings on tight town lots. Composite floors and galvanized steel near the water fit the region.

Oranjestad West at a glance

The ground, the work and the road in

Ground and climate

Coastal limestone and fill along the harbour.

What gets built

Government, retail, offices, cruise tourism and marinas.

Getting steel there

A short haul from the port of Barcadera.

Towns: Oranjestad · Cruise harbour

Steel we recommend

What we fabricate for Oranjestad West

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Shops and offices

Shopping centres, showrooms, offices and mixed-use blocks.

Commercial steel buildings →

Multi-storey buildings

Steel frames with composite deck for apartments, offices, clinics and schools.

Multi-storey steel framing →

Marinas and harbour buildings

Marina buildings, boat sheds, cruise and harbour buildings.

Coastal corrosion protection →

Contractors in Oranjestad West

You win the job in Oranjestad West. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Oranjestad West

Can you supply offices in central Oranjestad?

Yes. Composite steel frames with long spans for open floors, packed for tight town sites.

Can you supply marina buildings?

Yes. Marina offices, boat sheds and canopies, galvanized for the harbour.

The hotel coast and the capital

Other regions: the hotel coast and the capital

Noord, Oranjestad West and Oranjestad Oost: the high-rise and low-rise hotels on the north-west beaches, the capital, the cruise harbour and the airport.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Aruba. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Aruba

Talk to us about steel for Oranjestad West

Send the drawings or the site, size and use. We design or detail the steel for Oranjestad West’s wind and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Barcadera. WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.