Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Aruba · Permits and codes

Structural steel and Aruba’s building permits and codes

A new building in Aruba needs a building permit through the Department of Infrastructure and Planning (DIP). As part of the Kingdom of the Netherlands, Aruba often works with Eurocode and Dutch NEN practice, while many hotel owners and their lenders bring US codes. Your engineer of record agrees the basis with the authorities; we design to it and state it on the first sheet of our calculations.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Barcadera.

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Permits
DIP
Codes
Eurocode, NEN or US codes
Design basis
Set by your engineer
Our part
Basis stated on sheet one

Why it matters

Two code families, one clear basis

European and American steel codes use different load factors, section tables and steel grades. Mixing them in one design causes delays at review. We agree one basis with your engineer before modeling and keep it on every sheet.

We fabricate to either family: European grades and sections, or ASTM grades and AISC design, with mill certificates traced by heat.

Design basis

What the steel design states

The items we confirm with your engineer of record in Aruba before modeling.

ItemWhat we state
Code familyEurocode and NEN annexes, or IBC, ASCE 7 and AISC 360
WindBasic wind speed and exposure set by your engineer
SeismicGround type and spectral values
Steel gradesEN 10025 grades or ASTM grades, as specified
Bolts and weldsTo the same code family as the design

Who does what

Permit work, split clearly

World Steel supplies

  • Steel design or detailing to the code basis agreed for Aruba
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in Aruba
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In Aruba, the contractor and the engineer of record arrange

  • The building permit with DIP
  • Geotechnical report
  • Inspections on site
  • Foundations
  • Erection

Aruba

What we do not claim

World Steel holds no licence or registration in Aruba and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in Aruba.

Products and solutions

The World Steel pages behind this guide

Region by region

How this applies in your region

Aruba has 8 regions. Open Noord, Oranjestad West or Oranjestad Oost to see the local wind, ground and coast, the road from Barcadera and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Aruba project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Aruban buyers ask

Who issues building permits in Aruba?

The Department of Infrastructure and Planning (DIP). Your team files with the engineer or architect of record.

Can the design follow Eurocode?

Yes. We design and fabricate to Eurocode with European steel grades, or to US codes with ASTM grades, as your engineer specifies.

Do you supply drawings for the permit?

We supply the steel calculations and drawings your engineer needs. The application itself is made by your team.

Contact World Steel · Aruba

Talk to us about steel for Aruba

WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.