Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Santa Cruz · Region

Steel buildings and structural steel for Santa Cruz, Aruba

Santa Cruz lies in the centre of Aruba below the Hooiberg, the cone-shaped hill that rises over the island, with shops, homes and the road toward Arikok National Park.

The centre · Main town Santa Cruz

Main town
Santa Cruz
Group
The centre
Main towns
Santa Cruz, Hooiberg
Port
Port of Barcadera

Site conditions in Santa Cruz

What the site asks of your steel

Wind
Steady trade winds
Ground
Rock and thin soils
Air
Trade-wind salt
Rain
Flash runoff in showers

Our design note. Santa Cruz suits warehouses, shops and schools in the centre of the island. Clear spans, wind design and protected steel fit the region.

Santa Cruz at a glance

The ground, the work and the road in

Ground and climate

Dry hills, rock and thin soils.

What gets built

Housing, retail, light industry and services.

Getting steel there

A short haul from the port of Barcadera.

Towns: Santa Cruz · Hooiberg

Steel we recommend

What we fabricate for Santa Cruz

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Warehouses and logistics

Clear-span warehouses and stores for imported food and building supplies.

Warehouse and distribution buildings →

Shops and offices

Shopping centres, showrooms, offices and mixed-use blocks.

Commercial steel buildings →

Schools, halls and sports

Schools, community halls and sports buildings.

Sports facilities and arenas →

Contractors in Santa Cruz

You win the job in Santa Cruz. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Santa Cruz

Can you supply warehouses and stores?

Yes. Clear-span warehouses with dock doors, packed in erection order.

Is the centre of the island sheltered from salt?

Less spray reaches it than the coast, but the trade winds carry salt across the whole island.

The centre

Other regions: the centre

Paradera, Santa Cruz and Savaneta: the rock formations and the Hooiberg, the road into Arikok National Park, and the island’s oldest town on the south coast.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Aruba. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Aruba

Talk to us about steel for Santa Cruz

Send the drawings or the site, size and use. We design or detail the steel for Santa Cruz’s wind and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Barcadera. WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.