Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Noord · Region

Steel buildings and structural steel for Noord, Aruba

Noord is the north-west of Aruba, with the high-rise hotels of Palm Beach, the beaches of Malmok and Arashi, the California Lighthouse at the tip and the Alto Vista chapel inland.

The hotel coast and the capital · Main town Noord

Main town
Noord
Group
The hotel coast and the capital
Main towns
Noord, Palm Beach, Malmok
Port
Port of Barcadera

Site conditions in Noord

What the site asks of your steel

Wind
Open north-west coast
Air
Salt spray
Height
Hotel towers
Ground
Sand and limestone

Our design note. Noord builds hotel towers, timeshare blocks, restaurants and shops. Wind design for tall buildings and marine coatings come first.

Noord at a glance

The ground, the work and the road in

Ground and climate

Coral limestone, beach sand and dry, rocky ground inland.

What gets built

Hotels, timeshare, restaurants, retail and housing.

Getting steel there

About twenty minutes from the port of Barcadera.

Towns: Noord · Palm Beach · Malmok · Alto Vista

Steel we recommend

What we fabricate for Noord

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hotels and resorts

High-rise and low-rise hotels, timeshare blocks, lobbies and restaurants.

Multi-story steel buildings →

Shops and offices

Shopping centres, showrooms, offices and mixed-use blocks.

Commercial steel buildings →

Multi-storey buildings

Steel frames with composite deck for apartments, offices, clinics and schools.

Multi-storey steel framing →

Contractors in Noord

You win the job in Noord. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Noord

Can you supply hotel towers on Palm Beach?

Yes. Composite steel frames released floor by floor, with marine coatings for the beachfront.

Do beachfront sites need special foundations?

Your geotechnical engineer decides from the soil report; we supply column reactions and base details for the design.

The hotel coast and the capital

Other regions: the hotel coast and the capital

Noord, Oranjestad West and Oranjestad Oost: the high-rise and low-rise hotels on the north-west beaches, the capital, the cruise harbour and the airport.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Aruba. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Aruba

Talk to us about steel for Noord

Send the drawings or the site, size and use. We design or detail the steel for Noord’s wind and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Barcadera. WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.