Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Tunapuna-Piarco · Regional corporation

Steel buildings and structural steel for Tunapuna-Piarco, Trinidad

Tunapuna-Piarco holds Piarco International Airport, the St. Augustine campus of the University of the West Indies, Trincity’s malls and industrial estates along the corridor.

North · Seat Tunapuna

Site conditions in Tunapuna-Piarco

What the site asks of your steel

Seismic
High
Flood
Caroni plain
Wind
Open airport land
Ground
Clay in places

Our design note. Hangars, cargo sheds and logistics around Piarco, lecture halls and labs at St. Augustine and warehouses on the estates all suit long-span steel. Seismic detailing applies across the region.

Tunapuna-Piarco at a glance

The ground, the work and the road in

Ground and climate

Flat plains south of the Northern Range, rising into the hills to the north. Flood-prone low land toward the Caroni.

What gets built

Airport and logistics, education, retail, light industry, housing and agriculture in the south of the region.

Getting steel there

Thirty to forty minutes from the Port of Port of Spain along the Churchill-Roosevelt Highway.

Towns: Tunapuna · St. Augustine · Piarco · Trincity · Arouca

Steel we recommend

What we fabricate for Tunapuna-Piarco

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hangars and terminals

Long-span frames for hangars, terminals and maintenance bases.

Aircraft hangar buildings →

Warehouses and logistics

Clear-span warehouses and distribution centers with docks, mezzanines and racking loads.

Warehouse and distribution buildings →

Schools, halls and stadiums

Classrooms, community centers, panyards, stands and sports halls.

Sports facilities and arenas →

Contractors in Tunapuna-Piarco

You win the job in Tunapuna-Piarco. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Tunapuna-Piarco

Do you supply hangars and cargo buildings near Piarco?

Yes. Long-span frames for hangars, cargo sheds and maintenance bases.

Can you supply campus buildings?

Yes. Multi-storey frames and long-span halls for teaching and research.

North

Other municipalities in the north

Port of Spain, the East-West Corridor, the Northern Range and the north-east.

Site conditions on this page are general notes for planning. Your engineer of record confirms the seismic, wind, flood and soil values for your site under the code basis in force in Trinidad and Tobago. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Trinidad and Tobago

Talk to us about steel for Tunapuna-Piarco

Send the drawings or the site, size and use. We design or detail the steel for Tunapuna-Piarco’s seismic, wind and coastal conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Spain. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port of Spain. Our contact page for Trinidad and Tobago has the ports, the local time and the form.