Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Arima · Borough corporation

Steel buildings and structural steel for Arima, Trinidad

The Royal Chartered Borough of Arima sits at the eastern end of the East-West Corridor, a market town with industrial estates at O’Meara and Malabar and a proud First Peoples heritage.

North · Seat Arima

Site conditions in Arima

What the site asks of your steel

Seismic
High
Flood
River banks
Wind
Foothill exposure
Ground
Mixed soils

Our design note. Arima’s industrial estates use clear-span warehouses and light manufacturing buildings. We design for seismic loads and release packages in the order your crew erects them.

Arima at a glance

The ground, the work and the road in

Ground and climate

Flat to gently rolling land at the foot of the Northern Range, with rivers that flood after heavy rain.

What gets built

Light industry, warehousing, retail, housing and public services.

Getting steel there

About forty-five minutes from the Port of Port of Spain along the Churchill-Roosevelt Highway.

Towns: Arima · Malabar · O’Meara · Mount Pleasant

Steel we recommend

What we fabricate for Arima

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Warehouses and logistics

Clear-span warehouses and distribution centers with docks, mezzanines and racking loads.

Warehouse and distribution buildings →

Process and manufacturing plants

Portal and crane-bay frames, platforms and pipe racks for plants and industrial estates.

Manufacturing plants and crane bays →

Malls and commercial buildings

Retail parks, showrooms, supermarkets and office blocks.

Commercial steel buildings →

Contractors in Arima

You win the job in Arima. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Arima

Can you supply warehouses on the O’Meara estate?

Yes. Clear spans with dock doors, mezzanines and racking loads.

How far is Arima from the port?

About forty-five minutes from Port of Spain along the corridor.

North

Other municipalities in the north

Port of Spain, the East-West Corridor, the Northern Range and the north-east.

Site conditions on this page are general notes for planning. Your engineer of record confirms the seismic, wind, flood and soil values for your site under the code basis in force in Trinidad and Tobago. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Trinidad and Tobago

Talk to us about steel for Arima

Send the drawings or the site, size and use. We design or detail the steel for Arima’s seismic, wind and coastal conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Spain. WhatsApp, email or a video call with our engineers, booked at an hour that suits Port of Spain. Our contact page for Trinidad and Tobago has the ports, the local time and the form.