Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Special building accessories · Solar support structures

Put solar on the roof, and keep the roof safe

A field of solar panels adds weight to a roof and catches the wind like a sail. On a metal building, that load goes into purlins and frames that were sized before anyone planned solar. We design and fabricate PV support steel, rails and posts, and check the primary and secondary framing for the added loads, whether the panels go on a new roof, an existing one or a carport.

Rows of solar panels on rails over a metal roof, with weight and wind uplift arrows into the purlins Added weight Wind uplift Purlins checked
IllustrationThe frame checked for the new loads.

Mounting

Three places solar can go

Roof-mountedRails and supports on a metal roof.
CarportPosts and beams that shade cars and make power.
Ground or canopyFreestanding frames in a yard or lot.

Why it pays

Power on the roof, no worry under it

  • Frame checked

    New loads, verified.

  • Wind considered

    Uplift in the design.

  • Ready for solar

    Steel matched to the layout.

  • One design

    Building and PV steel together.

Steel
PV support steel, rails and posts
Frame check
Primary and secondary framing checked for the added loads
Design
Designed to AISC 360 under the IBC, with ASCE 7 wind loads
Inputs
Module layout and weights from your solar designer
Roof access
OSHA rules apply during installation
Scope
Steel only; modules and electrical by the solar contractor
Finished feed mill with long blue metal roofs, seen from the airPhoto
Rows of roof purlins and rod bracing across a steel framePhoto

How it works

Layout in, checked steel out

  1. Module layoutFrom your solar designer.
  2. Frame checkedFor weight and wind.
  3. Support steel madeRails and posts.
  4. Shipped markedFor your erector.

Questions

Solar support questions

Can you add solar to an existing metal building?

Often, yes, after we check the existing frame for the added loads. Send the building drawings and the module layout.

Who installs the panels?

The solar contractor mounts the modules and handles the electrical work. Your erector installs the support steel.

Do you supply the panels?

No. We supply the steel that carries them.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Solar Panel Support Structures

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of special building accessories, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.