Intake
Receiving bays, silos or tanks for raw material, often with a canopy and a truck scale beside the building.
Loading bay structures →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Along the line
Tap a stage on the flowsheet above to jump to it.
Receiving bays, silos or tanks for raw material, often with a canopy and a truck scale beside the building.
Loading bay structures →The main line: long clear spans so the line can change, with equipment supports, pipe and cable racks hung from or standing under the roof.
Machinery support frames →Access and operating platforms around mixers, tanks and dryers, with stairs, guards and ladders detailed to the equipment layout.
Equipment platforms →Wet rooms that are cleaned every shift. Members are kept out of the wet zone where possible, and the coating is chosen for the chemicals used.
Corrosion protection system →Packing lines and finished goods storage, sometimes high-bay racking or a cold room at the end of the line.
Steel mezzanine frames →Loading docks and canopies on the outbound side, kept apart from intake so raw and finished product do not cross.
Loading dock canopies →Wash-down areas
Where the plant runs wet, the details matter more than the member sizes. These are set with the owner before fabrication.
Photo
Members over open product are kept to a minimum, and the ones that remain can be detailed with sloped tops or closed sections, as the owner specifies.
Hot-dip galvanizing, duplex or epoxy systems, chosen for the exposure and the cleaning regime in the owner’s specification.
Connections and base plates are detailed so water runs off, and column bases in wet rooms can sit on curbs by others.
Roof framing leaves openings for exhaust and make-up air, which wet process rooms need to keep condensation off the steel.
Which plant
Process halls with wash-down zones, silos and high-bay storage.
Food, beverage and feed plants →Heavy machine loads and long production lines with overhead material handling.
Machinery support frames →Controlled interiors, heavy service loads in the roof and strict cleaning rules.
Advanced manufacturing plants →Corrosive exposure, process structures and pipe racks beside the building.
Oil, gas and petrochemical steel →From our project files
A beverage plant in Can Tho City, Vietnam (2023), with long-span painted frames over the process floor. Meat, pharmaceutical and plastics plants in Thailand show the same frame adapted to different products.
See the Hau Giang project
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Yes, when the process and building services engineers give us the loads and hanger points before design. The roof is framed for them, with openings where ducts pass through.
Yes. Operating and access platforms, stairs, ladders and guards are designed from the equipment layout and shipped with the main frame.
The plant fabricates 2,500 t of structural steel a month. Our largest food processing order, the CPV Food plant in Vietnam, was about 2,500 t.
The one the owner’s specification calls for, often hot-dip galvanizing, a duplex system or epoxy. We help match it to the exposure and the cleaning chemicals.
Yes. Members over open product can be reduced, closed or given sloped tops, as the owner’s hygiene rules ask. Food-safety approval stays with the owner.
We detail the steel to the hygiene requirements in the contract documents. The plant layout and food-safety approvals stay with the owner and their design team.
Keep reading
Price it or partner with us
Share the plant layout, the equipment weights and the wash-down zones. We will price the frame, the platforms and the pipe supports.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833