Mining and construction equipment rebuild
Haul trucks and loaders come apart under a crane, so the bay is wide, tall and fed by a drive-through door.
Overhead cranes →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
5,000 t
Sunpro Steel Factory
Can Tho City, Vietnam · 2024
2,500 t
CPV Food Processing Factory
Dong Nai Province, Vietnam · 2020
2,000 t
Long Son petrochemical
Ba Ria–Vung Tau, Vietnam · 2022
2,000 t
M&D warehouse, Thailand
Thailand · 2024
1,500 t
Tongwei feed factory, phase 1
Dong Thap Province, Vietnam · 2018
1,000 t
New Era cold storage, phase 1
Tay Ninh Province, Vietnam
Follow the load
A crane load travels through six elements. Five of them leave our plant; the last is designed by others from the reactions we give.
The heaviest lift, plus impact, from the crane maker’s data
Wheel loads and side thrust onto the rails
Fatigue from millions of wheel passes over the building’s life
Eccentric load into the column, often a built-up section
Heavy plates cut on our laser up to 100 mm thick
Designed by others from the column reactions we provide
What goes under the crane
Haul trucks and loaders come apart under a crane, so the bay is wide, tall and fed by a drive-through door.
Overhead cranes →Very heavy lifts over a short distance, and a door sized for the shipping frame.
Crane supporting structures →Long bays with pits and jacking areas below the crane, often with a track in the floor.
Crane runway beams →Heavy machines on the floor and a crane above for changing dies and moulds.
Machinery support frames →
Photo
Photo
Photo
Photo
From our project files
A factory in Quang Ngai Province, Vietnam, built in 2019 for one of Vietnam's largest steel groups. Its tall columns went up with mobile cranes, bay by bay. The Perumal Steel Mould factory in Malaysia shows heavy frames for a metalworking plant.
See the Hoa Phat projectScope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Capacity, span, wheel loads, wheel spacing, hook approach and headroom, and the duty class. The runway, brackets and columns are designed from that data.
Yes. Runway girders are checked for the number of wheel passes in the crane’s duty class, following AISC 360 and the AISC design guide for crane-supporting buildings.
Yes, when both cranes are known at design. Two cranes change the girder and column loads, so they are set before the frame is sized.
The plant fabricates 2,500 t of structural steel a month, builds up columns and girders from plate, and its laser machines cut steel up to 100 mm thick for base plates and brackets.
With a door frame and a header girder that carry the wind on the door back to the main frame. The door supplier gives the door weight and the guide loads.
Others, from the column reactions we provide for every load case. Anchor bolts and their setting plan come with our drawings.
Keep reading
Price it or partner with us
Share the crane capacity and span, the hook height you need and the door size. We will design the frame around them and price the steel.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833