Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Heavy equipment buildings

Heavy equipment buildings: start from the hook height

Assembly halls, rebuild shops and test bays for mining trucks, turbines, presses and rail cars are designed from the inside out: the crane, the hook height and the door the product leaves through. Our plant fabricates 2,500 t of structural steel a month, and our laser machines cut plate up to 100 mm thick for base plates and crane brackets.

HOOK RAIL EAVE DOOR SET THE HOOK FIRST. THE REST FOLLOWS.
  • Hook height: The tallest product plus its rigging and a lift clearance
  • Top of rail: Hook height plus the crane maker’s headroom
  • Eave height: Top of rail plus the crane clearance to the roof steel
  • Door opening: The largest product on a trailer, with margin

Large-project capacity

Heavy frames by the thousand tons, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

Follow the load

From the hook to the ground, every link is steel we design

A crane load travels through six elements. Five of them leave our plant; the last is designed by others from the reactions we give.

Tall steel columns of the Hoa Phat factory in Vietnam lifted into place by crane, fabricated by World Steel
  1. Hook and load

    The heaviest lift, plus impact, from the crane maker’s data

  2. Crane and trolley

    Wheel loads and side thrust onto the rails

  3. Runway girder

    Fatigue from millions of wheel passes over the building’s life

  4. Column bracket or stepped column

    Eccentric load into the column, often a built-up section

  5. Base plate and anchor bolts

    Heavy plates cut on our laser up to 100 mm thick

  6. Foundation

    Designed by others from the column reactions we provide

What goes under the crane

Four kinds of heavy equipment building

Mining and construction equipment rebuild

Haul trucks and loaders come apart under a crane, so the bay is wide, tall and fed by a drive-through door.

Overhead cranes →

Turbine, transformer and generator assembly

Very heavy lifts over a short distance, and a door sized for the shipping frame.

Crane supporting structures →

Rail car and bus maintenance

Long bays with pits and jacking areas below the crane, often with a track in the floor.

Crane runway beams →

Press, mould and machine-tool halls

Heavy machines on the floor and a crane above for changing dies and moulds.

Machinery support frames →
Columns and roof frames of the Hoa Phat factory being erected with mobile cranes Photo
Finished Hoa Phat factory building with blue wall cladding and a tall gable Photo
Orange-painted heavy steel frames for a steel mould factory loaded on a truck Photo
Heavy painted steel members stacked in the World Steel plant before shipping Photo

From our project files

Hoa Phat factory: tall columns for a steel group

A factory in Quang Ngai Province, Vietnam, built in 2019 for one of Vietnam's largest steel groups. Its tall columns went up with mobile cranes, bay by bay. The Perumal Steel Mould factory in Malaysia shows heavy frames for a metalworking plant.

See the Hoa Phat project

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame, runway girder, crane bracket and door steel designed from the crane maker’s data
  • Built-up columns and girders, with base plates cut on our laser up to 100 mm thick
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • The crane itself, its rails, electrification and load testing with the crane supplier
  • Foundations, pits and heavy floor slabs
  • Erection, doors and building services

Questions from US contractors

Heavy equipment building steel: questions and answers

6 answers, grouped by topic.

Cranes and loads 3 answers

What do you need from the crane supplier?

Capacity, span, wheel loads, wheel spacing, hook approach and headroom, and the duty class. The runway, brackets and columns are designed from that data.

Do you design runway girders for fatigue?

Yes. Runway girders are checked for the number of wheel passes in the crane’s duty class, following AISC 360 and the AISC design guide for crane-supporting buildings.

Can a building have two cranes on one runway?

Yes, when both cranes are known at design. Two cranes change the girder and column loads, so they are set before the frame is sized.

Heavy frames 3 answers

How heavy a frame can your plant fabricate?

The plant fabricates 2,500 t of structural steel a month, builds up columns and girders from plate, and its laser machines cut steel up to 100 mm thick for base plates and brackets.

How do you frame a very large door in an end wall?

With a door frame and a header girder that carry the wind on the door back to the main frame. The door supplier gives the door weight and the guide loads.

Who designs the foundations for a crane building?

Others, from the column reactions we provide for every load case. Anchor bolts and their setting plan come with our drawings.

Keep reading

Related pages

Price it or partner with us

Send the crane data and the largest product size.

Share the crane capacity and span, the hook height you need and the door size. We will design the frame around them and price the steel.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details